SPECIFICATIONS
35% SUBMITTAL
(100% DESIGN DEVELOPED)
EDINBURG-KERRVILLE BLDG 4
DIP VAT REDESIGN – A-E
PREDESIGNAND DESIGN
SERVICES
PN: T.B.D.
MOORE FIELD EDINBURG, TX
Prepared For:
U.S. Department Of Agriculture
USDA APHIS
5601 Sunnyside Avenue
RM 3-2102
Beltsville, Maryland 20705
Contract No.
12805B23D0001
Task Order No.
1232SA25F03843
Prepared By:
The Johnson-McAdams Firm, P.A.
Greenwood, Mississippi
Tuesday, April 21, 2026
DIVISION 01 – GENERAL REQUIREMENTS
01 01 00
General Requirements
01 11 00
Summary Of Work
01 33 00
Submittal Procedures
01 35 13
Special Project Procedures
01 35 26
Governmental Safety Requirements
01 35 29
Safety And Occupational Health Requirements
01 42 00
Sources For Reference Publications
01 45 00
Construction Quality Control
01 50 00
Temporary Facilities and Controls
01 57 19
Temporary Environmental Controls
01 62 35
Recycled / Recovered / Biobased Materials
01 78 23
Operation and Maintenance Data
DIVISION 02 – EXISTING CONDITIONS
02 41 00
Demolition
DIVISION 03 – CONCRETE
03 30 00
Cast-In-Place Concrete
DIVISION 05 – METALS
05 50 13
Miscellaneous Metal Fabrications
DIVISION 09 - FINISHES
09 90 00
Paints and Coating
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19
Metal Building Systems
DIVISION 22 – PLUMBING
22 00 00
Plumbing, General Purpose
DIVISION 26 – ELECTRICAL
26 20 00
Interior Distribution System
26 51 00
Interior Lighting
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 16 19
Concrete Sidewalks
Edinburg-Kerrville BLDG 4 Dip Vat Redesign
SECTION 01 01 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SUMMARY
This section establishes project-wide administrative and execution requirements for Edinburg-Kerrville BLDG 4 Dip Vat Redesign at Moore Field, Edinburg, Texas. The work consists of modifications and mprovements to Building 4 (620515B004) to maximize use of the existing dipping vat and drip pad, including canopy work, cattle pens, gates, alleys, chute access, water service to pens, lighting, 120-volt receptacles, loading pen improvements, and related site, structural, civil, plumbing, and electrical work.
1.2 PROJECT CONDITIONS
The project is located within an active USDA ARS research installation that operates under biosecurity controls. Coordinate the work with the Government so that ongoing site operations, research functions, animal movement, security, and access are not adversely affected.
1.3 RELATED REQUIREMENTS
Section 01 00 11 SPECIAL CONTRACT REQUIREMENTS applies to sitespecific restrictions and coordination. Section 01 01 00 SUMMARY OF WORK applies to description of the work
The beginning of the document. Download the full file to read on.