SPECIFICATIONS
EDINBURG-KERRVILLE BLDG 4
DIP VAT REDESIGN – A-E
PREDESIGN AND DESIGN
SERVICES
PN: 12805B23D0001
MOORE FIELD EDINBURG, TX
Prepared For:
U.S. Department Of Agriculture
USDA APHIS
5601 Sunnyside Avenue
RM 3-2102
Beltsville, Maryland 20705
Contract No.
12805B23D0001
Task Order No.
1232SA25F03843
Prepared By:
The Johnson-McAdams Firm, P.A.
Greenwood, Mississippi
August 31, 2026
Edinburg-Kerrville BLDG 4 Dip Vat Redesign
4125
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01
01 00 11
01 00 21
01 01 00
01 11 00
01 33 00
01 35 26
01 42 00
01 45 00
01 50 00
01 57 50
01 78 23
February 29, 2024
08/15, CHG 2: 08/21
08/23, CHG 3: 08/25
WARRANTY OF CONSTRUCTION
GENERAL PARAGRAPHS
CONTRACTOR QUALITY CONTROL
GENERAL REQUIREMENTS
SUMMARY OF WORK
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
PROJECT CLOSEOUT
TEMPORARY ENVIRONMENTAL CONTROLS
OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00
DEMOLITION
DIVISION 03 - CONCRETE
03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 13
08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19
08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00
05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 26 - ELECTRICAL
26 20 00
26 51 00
05/25, CHG 2: 02/26 INTERIOR DISTRIBUTION SYSTEM
05/20, CHG 2: 11/21 INTERIOR LIGHTING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Edinburg-Kerrville BLDG 4 Dip Vat Redesign
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
4125
Edinburg-Kerrville BLDG 4 Dip Vat Redesign
4125
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
PART 1
1.1
1.1.1
GENERAL
WARRANTY OF CONSTRUCTION
General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or