STATEMENT OF WORK
PR# 2126406B4200RJ001
04/02/2026
UNITED STATES COAST GUARD
SURFACE FORCES LOGISTICS CENTER
STATEMENT OF WORK rev. 2
TRS-3D / AN SPS-75 AIR SEARCH RADAR SYSTEM COMPONENTS, REPAIR
STATEMENT OF WORK
PR# 2126406B4200RJ001
04/02/2026
OVERHAUL/ REPAIR REQUIREMENTS
1. GENERAL
1.1 BACKGROUND: This document sets forth the requirements for the overhaul services, receipt, storage, inspection, repair, testing, preservation, packaging, packing, and marking of TRS-3D / AN SPS-75 Air Search Radar System overhaul components, the following items. Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer within 10 days.
1.2 SCOPE: U.S. Coast Guard SFLC requires complete overhaul/ repair services for the item(s) listed in 1. This repair requirement establishes uniform standards and procedures to be used in the repair process, for example, receipt and evaluation, testing, maintenance procedures, selection and use of parts and material, marking, preservation, and packing for shipment. The requirements described herein are considered minimum and are not intended to replace any procedures, controls, examinations, or tests normally employed by the contractor to assure the quality of the electronic equipment and those aspects of the maintenance processes, which are applicable to electronic equipment.
1.3 OBJECTIVE: The objective of this contract is the repairs of the following types of equipment/components are included in this specification: Complete assemblies, Equipment subassemblies, Circuit card assemblies, Power supplies, Modules and other components as specified in solicitation. Part Number
NSN
Delivery (
ARO)
Pedestal
54.2424.600.00
5985-01-676-8432
14 months
Radar Contr. & Comm. (RCC) for DW
54.2881.822.00
5998-12-412-0350
14 months
Radar Display Contr. (RDC) for DW
54.2881.823.00
5998-12-412-0351
14 months
Power Supply
83093630
6130-12-384-2242
14 months
Mixer Stage, Frequency
54.2325.140.00
5895-12-338-0824
14 months
Monitor, Voltage Deviation
54.2893.376.00
5840-12-344-5692
14 months
Amplifier, Video
54.1058.563.00
5996-12-311-7075
14 months
RF/IF Unit
54.1084.477.00
5840-12-351-8818
14 months
2ND IF Amplifier
54.1078.420.00
5996-12-337-6948
14 months
Synthesizer
54.2325.018.00
5840-12-330-4571
14 months
Gear Pump Refinex 45/45
80075567
4320-01-630-6977
14 months
Description
STATEMENT OF WORK
PR# 2126406B4200RJ001
04/02/2026
Circuit Card Assembly
83065084
5998-12-386-8598
14 months
ATE-Controller for DW
83235687
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Amendment
- Attachment 3: REQUEST FOR CLARIFICATION FORM
- Attachment 4: PAST PERFORMANCE INFORMATION FORM
- Attachment 5: JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
- Attachment 6: WAGE DETERMINATION
- Amendment
- Amendment
- Attachment 2: STATEMENT OF WORK Rev3
- Attachment 8: Example OpenandInspectionReport sanitized
- Atttachment 7 - Responses to Questions
- Amendment