Attachment 2. Statement of Work

Updated

A PDF document (62 KB) attached to USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements, from the Forest Service. Due Nov 12, 2026, 5:00 PM (UTC-7).

File name: C04_Attachment 2. Statement of Work_1240LU26Q0132.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Hebgen Lake Ranger District
330 Gallatin Road, West Yellowstone, MT 59758
Network Cabling and IT Room Improvements
Statement of Work
The following are the items required by this contract to meet facility IT infrastructure basic requirements at this location. Details on installation, testing, as-built drawings, and qualifications requirements can be found in the ADI – Guidelines For Typical Installations.
a. Plywood backboard – 4’x8’ size, fire-rated and properly secured to the wall (stud or masonry) with some modifications allowed to accommodate space. b. Wall mounted IT cabinet – choose 1 for scope of installation – (A)-HWD 20”x24”x22”, (B) HWD 25”x24”x26.5” or (C) HWD 42”x24”x 36” - modifications are acceptable that meets the requirement for secure access. Where a wall mounted enclosed cabinet rack is installed, it’s recommended for a minimum of 36” of clear space around the wall mounted rack. Includes installation of rack accessories including cable management and equipment shelves, and installation of rack mounted power distribution components. c. Grounding – Copper telecommunications ground buss bar with stand offs. Installation of a telecommunications main ground bus bar (TMGB). Bonding of telecommunications cabinet to the building grounding system, and installation of required copper bonding conductors is required.
d. Dedicated 120vac 20amp AC circuit if not already present to power a UPS- see belowrecommend installing 20A receptacle in back box of cabinet if new addition. e. UPS – Uninterruptable power supply, appropriately sized, rack or floor mount. f. PDU- Power distribution unit, 8 outlet capacity for ample power distribution. All electrical work must be performed in accordance with applicable local electrical codes. g. Cat 6 cabling for Wireless Access points and user workstations (see included building layout map with cabling access points labeled). Installation of 51 new category 6 structured cabling throughout the building is required. Installation of cabling to workstations and device locations as required, installation of cabling supports and pathway systems, installation of patch panels and termination hardware, termination of all cabling at the new telecommunications cabinet, and labeling of all cabling and patch panels is required. All structured cabling installed must be home-run back to the new data cabinet for termination and management.

h. Testing & Certification - Upon completion of installation, the contractor will perform full