Attachment 2: Statement of Work
Updated
A PDF document (2.9 MB) attached to FY23-28 General Construction Services BPA - W911S223S8000, from the Department of the Army. Due Nov 30, 2027, 11:59 PM (UTC-5).
File name: Attachment 2 - Statement of Work (SOW).pdf
The full file is for paid members, or buy this bid alone.
Preview
GENERAL CONSTRUCTION BLANKET PURCHASE AGREEMENT (BPA)
SW-01. SCOPE: The Contractor shall furnish all labor, equipment, and material for the construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures at Fort Drum, New York, in accordance with the specifications and subject to the terms and conditions of the Agreement and each subsequent BPA Call.
SW-02. GENERAL: All work shall be done by personnel skilled in the type of work involved. When new work adjoins, connects, or abuts existing work or facilities, the existing work or facilities shall be altered as required and the connections made in an approved and professional manner. All existing work damaged by the Contractor’s operations, other than the material or facilities to be removed, shall be repaired. or replaced by the Contractor at no additional cost to the Government. Prior to performance of any work, a preconstruction conference meeting shall be held at Fort Drum. The Contractor shall have a representative attend who has authority to make decisions for, and sign documents on behalf of the Contractor. The Contractor shall clean up all debris and discarded materials resulting from operations at the end of each workday. Materials shall be disposed of off-post in accordance with applicable local, state, and federal laws and regulations. In case of conflict among these laws and regulations, the most stringent law or regulation shall apply. The Contractor shall be responsible for providing a complete and usable facility. Contractors attending site visits must provide personnel who work for the company. If sending a subcontractor to site visits, the attendee must be designated by the owner of the company on a notarized document to sign on their behalf. SW-03. LOCATION: Fort Drum, NY.
SW-04. PRINCIPAL FEATURES: The Contractor shall be primarily responsible for the construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. The Statement of Work (SOW) for each Call will include tasks in a variety of areas to include, but not limited to civil, electrical, mechanical, and structural.
4.1 The Contractor shall provide all necessary resources, management, personnel, materials, supervision, transportation, supplies, and equipment to repair or construct real property facilities and structures at Fort Drum. The following types of projects are included in the SOW and may
The beginning of the document. Download the full file to read on.