STATEMENT OF WORK
SCOPE OF CONTRACT
Provide all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road rehabilitation on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of, but is not limited to, installing erosion and sedimentation controls (E&S Controls), traffic control, ditch work, repairing/replacing/placing new guide rail, removing existing culverts, installing new culverts, milling and overlaying existing asphalt, full depth replacement of asphalt, full depth asphalt spot repairs, asphalt shoulder repairs, line painting, constructing accessibility features, and placing and compacting road base and driving surface aggregate. All work performed will be completed in accordance with the Standard Specification for Roads and Bridge on Federal Highway Projects FP-14 located at this link: https://highways.dot.gov/sites/fhwa.dot.gov/files/docs/federal-lands/specs/12851/fp14.pdf and the Forest Service Supplemental Specifications to the FP-14 (FSSS) included as part of this Statement of Work. Submittals for specific items will also be required as indicated on the design drawings.
LOCATION AND DESCRIPTION OF WORK
The specified Work Site is located in Mead Township, Warren County, within the Zone 1, Bradford Ranger District (Map 1), of the Allegheny National Forest. The Work Site is located at Forest Road 492 and Forest Road 492A (Map 2). Materials to be delivered include items specified in the design drawings. The length of road that will receive maintenance is a total of approximately 2.97 miles. Additionally, two recreational parking areas, two overlook parking areas, and two pull off areas are proposed to receive maintenance as well.
725158497253MAP 1
00MAP 1
52591217130600
5676900104775MAP 2
00MAP 2
center000
GENERAL NOTES:
A pre‐work conference will be conducted after the contract award at which time a schedule of items will be given to the Contractor. Adjustments to this schedule may be made as priorities change. Any such adjustments require prior written documentation (Work Order) from the Contracting Officer (CO). Prior to any earth disturbing activities, contractor shall call the Pennsylvania One Call System (800-242-1776) and all Oil & Gas Operators in the work area to determine locations of any underground utility lines. Contractor shall install “ROAD CLOSED,” “TRUCK TRAFFIC” or “ROAD CONSTRUCTION AHEAD” signs on all roads worked on in this project. Signs shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Contractors sign plan must be approved by Forest Service prior to work. Signs will be covered on weekends, holidays, and any days when contractor is not working.