Home / Whiteface Campground Well Replacement / Document

Attachment 2: Statement of Work and Specifications

Updated

A PDF document (2.6 MB) attached to Whiteface Campground Well Replacement, from the Forest Service. Due Dec 14, 2026, 12:00 PM (UTC-6).

File name: Att 02_SOW and Specs_261026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Superior National Forest
Whiteface CG Well Replacement
Specifications
Dated: 2026
Background
The Laurentian Ranger District within the Superior National Forest has a need to upgrade the well equipment at its Whiteface Campground location. Currently the well equipment located at the Whiteface Campground is obsolete and hard to find replacement parts for. The purpose of this contract is to replace the current well equipment with new equipment that can be serviced.

Photo of Whiteface CG Loop 3 Well

GENERAL REQUIREMENTS

1.0 Description of Services:

The contractor shall provide all management, supervision, labor, personnel, transportation, materials, equipment, and supplies, except as otherwise specified, necessary to provide services at the Whiteface Campground located in Makinen, MN. All work shall be performed in accordance with this statement of work and all federal, state, and local laws and regulations.

Superior National Forest – Whiteface CG Well Replacement

2.0 Location and Description:

The project is located within the Superior National Forest at the Whiteface Campground in Makinen, MN on the Whiteface Reservoir. The Whiteface Campground is located at the following address:
Whiteface Campground
Whiteface Reservoir Road, County Rd 618
Makinen, MN 55763

2.1 Accessibility:

The site is accessible by a paved/gravel driveway and parking lot. The driveway and parking lots are routinely cleared of snow during the winter months.

3.0 Performance Period:

This project is expected to be completed before June 25th, 2027.

4.0 Prework Conference:

Prior to commencement of work, the Contracting Officer (CO) or the Contracting Officer Representative (COR) will schedule a meeting with the contractor to discuss the contract terms, work requirements and schedule. At the conference, the Contractor shall designate, in writing, the name and phone number of the Contractor’s on-site representative and their contract responsibilities and authority.

5.0 Contractor Representative:

Provide an onsite contract representative who will oversee the performance of the work specified in this contract. Designate in writing to the CO, the name of the contract representative and an alternate(s) who shall have the authority to authority to act for the Contractor on all contract matters relating to daily operation of this contract. Notify the CO/COR at least 10 work days in advance of any subsequent change of personnel in this position. Replacement personnel shall have the same level or better experience as the person

The beginning of the document. Download the full file to read on.

Other documents in this bid