Home / Geotechnical Drilling Services for Project OR FLAP DOUGLAS… / Document

Attachment 2: Table of Borings

Updated

A PDF document (46 KB) attached to Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement, from the Federal Highway Administration. Due Nov 17, 2026, 2:00 PM (UTC-8).

File name: Attachment 002 Table of Borings.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Table of Borings - OR FLAP DOUGLAS 251(2) Winchester Creek Bridge Replacement - 2026 Geotechnical Investigation Boring ID

Purpose of Boring

Latitude1

Longitude1

Estimated
Estimated Feet
Feet of Auger
of Core (HQ)

Maximum Subgrade
Possible Maximum
Depth (ft)
No. of SPTs2 Samples

Possible
Shelby
Samples

Comments: Drill Type, Access, Instruments, etc.

BH26-01

Bridge Foundation

43.67511

-124.17883

Truck-mounted rig, traffic control/rolling closure, patch pavement. Underground utilities at approximate boring
location shall be avoided. Perform suspension logging for seismic design.

BH26-02

Bridge Foundation

43.67497

-124.17833

Truck-mounted rig, traffic control/rolling closure, patch pavement. Underground utilities at approximate boring
location shall be avoided.

TOTALS

NOTES:

1 GPS coordinates are approximate. Field locating is required. 2 SPT samples are on 2.5-ft intervals: 2.5, 5, 7.5, 10
3 HQ3 for all rock coring.
4 All boring locations are subject to change based on alterations to the proposed alignment. Borings may be moved up to 50 ft. from their current locations

The beginning of the document. Download the full file to read on.

Other documents in this bid