Attachment 2: Technical Requirements Redacted
Updated
A PDF document (157 KB) attached to Sources Sought Midwave Camera, from the Department of the Air Force. Due Oct 29, 2026, 3:00 PM (UTC-4).
File name: Attachment 2- Technical Requirements_13 October 2026_Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work
For
Midwave Camera
Title: Midwave Camera
Document Date: 10/13/2026.
1. Scope: The vendor should provide a 1.5-5 micron midwave camera and accessories per the requirements listed below to include shipping of instrument to and from vendor facility, calibration of instrument and lens, and delivery of lens and calibration data.
2. Background: N/A
3. Applicable Documents Midwave Camera.
4. Requirements/Salient Characteristics:
The following specification lists the minimum (threshold) requirements for the midwave camera: 1. 25 mm, 50 mm, and 200 mm focal length options
2. Temperature measurement range -20 - 3000 degrees C without the requirement to physically remove and replace filters or filter wheels
3. Spectral range 1.5-5 microns
4. On device recording capability with >1 hour of record time at full frame rate 5. Calibration of lens/camera/filter combination for included filters 6. Protective case for lens', instrument, and computers
7. Trigger input
8. Maximum full frame rate greater than 1 kHz
9. Minimum focal length of less than 5 meters for all optics
10. Real time temperature calibration
11. Minimum exposure time 300 nanoseconds or less for full frame rate 12. Operating temperature -10 C to 45 C
13. FPA size at least 640x512
14. Mechanism for mounting instrument to prevent rotation on mount 15. At least a 4 position user configurable filter wheel that accommodates 1 inch filters
16. Computer controller included
17. Analysis software
18. 3x blank filter holders
5.0 Period of Performance:
1. The vendor shall deliver and complete all requirements of this Statement of Work no later than 90 days after contract award.
2. Contractor shall be responsible for transportation of all new products, loading, unloading, storage and all necessary movement from factory to final onsite set up.
3. The contractor Project Manager shall be responsible for on-site coordination of all deliveries of their product, to include access to and operation of any equipment needed for unloading and movement of materials or product necessary to complete all requirements of this Statement of Work.
4. Free from defects in material and workmanship, under normal and proper use in accordance with equipment user manual, for the period of time of two year after receipt.
4.0 Place of Performance:
Air Force Institute of Technology (AFIT/EN)
2950 Hobson Way,
Building 640, Room 203,
Wright-Patterson AFB, OH 45433-7765
4.1 Payment: 100% payment upon completion of all requirements specified in this
The beginning of the document. Download the full file to read on.