Attachment 2: TSII Statement of Work
Updated
A PDF document (234 KB) attached to TSA DTSS and TSII Re-Competition, from the Transportation Security Administration. Due Nov 6, 2026, 10:00 AM (UTC-5).
File name: Attachment 2 - TSII Statement of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
Task Order Number: ###
II.
STATEMENT OF WORK
A. TITLE OF REQUIREMENT
TSIF Systems Inventory & Integration (TSII) Services.
B. REQUIRING ORGANIZATION
Transportation Security Administration (TSA), Acquisition Program Management (APM).
C. INTRODUCTION/BACKGROUND
This task order statement of work delineates direct support requirements for providing TSIF Systems Inventory & Integration (TSII) Services to the TSA at the TSA Systems Integration Facility (TSIF), a 128,000-square-foot test facility located at Ronald Reagan Washington National Airport. The TSIF is a TSA test bed location, where the APM TSIF Test Team (APM’s Test and Evaluation Division TSIF Test Branch and Test Infrastructure and Operations Branch) test and evaluate Transportation Security Equipment (TSE) for procurement, as well as systems and concepts under development, to verify performance against established requirements and confirm operational compliance to the TSA mission. The TSIF Test Team supports a wide variety of laboratory technical support activities to numerous stakeholders at the TSIF.
D. SCOPE
The Contractor shall support TSA’s needs for TSIF inventory, equipment management, Information Technology (IT) systems administration, logistics, and integration services. TSII services apply to Test and Evaluation (T&E) onsite property, support equipment, IT systems specific to T&E, and test object provisioning. Additionally, TSII services apply to TSIF building modifications specific to TSE installations and the management, operation, and maintenance of local conveyance equipment, e.g., the resident Baggage Handling System, baggage rollers, and forklifts.
The Contractor shall be able to provide onsite personnel resources at the TSIF location to perform these functions for all regular business days during the specified period of performance, where regular onsite access and work is required per current COVID-19 workplace conditions and associated personnel Personal Protective Equipment (PPE) considerations.
For all services, the Contractor shall assist with compliance with existing International Organization for Standardization (ISO) certified processes, assisting the TSIF Test Team in execution of certified ISO 9001:2015 Quality Management System (QMS) processes specific to test objects, resident TSE systems, test support equipment and tools, laboratory access controls, test area safety, and TSE maintenance. The Contractor shall comply with the TSIF Test Team’s QMS, including all aspects associated personnel training, process
The beginning of the document. Download the full file to read on.