VADR-RFP

Attachment 03 - CDRL

80KSC021R0034 Rev B

ATTACHMENT 03

CONTRACT DATA REQUIREMENTS LIST (CDRL)

FOR
Venture-Class Acquisition of Dedicated and Rideshare (VADR) Launch Services

VADR - RFP

Attachment 03 - CDRL

80KSC022R0034 Rev B

This page left intentionally blank.

VADR - RFP

Attachment 03 - CDRL

80KSC022R0034 Rev B

CONTRACT DATA REQUIREMENTS LIST (CDRL)

The Contract Data Requirements Lists (CDRL) for CLIN 1 and CLIN 2 identify critical elements of the contracted effort where NASA requires aspects of mission integration insight and approval. The following CDRLs define the scope of documentation required; however, NASA will utilize the Contractor’s existing documentation to the extent practicable. Where there is not a direct match between a CDRL item and the Contractor’s standard documentation, the Contractor’s documentation will be acceptable provided it contains equivalent data requirements. CDRL approval may be assumed unless the Contractor is notified by NASA of disapproval within thirty (30) days. Under certain circumstances, NASA may elect to eliminate certain submittal cycles.
All CDRL data requirements shall be delivered electronically to the KSC ELV Library and the Contracting Officer. The Contractor shall notify the Contracting Officer in writing of CDRL delivery. All electronic formats shall be mutually acceptable to ensure government accessibility. The requirements for CLIN 1 CDRLs begin with Table A3-1: CDRL Index for CLIN 1 and the requirements for CLIN 2 CDRLs begin with Table A3-2: CDRL Index for CLIN 2. Note: Data required in response to this factor that is maintained by a subcontractor may be delivered by either the Offeror, or subcontractor, directly to the Contracting Officer.

VADR - RFP

Attachment 03 - CDRL

80KSC022R0034 Rev B

Table A3-1: CDRL Index for CLIN 1
Item

Document

Approval/
Initial Submittal
Review/Submit
Date

Subsequent Submittal
Date

Documentation

VADR 1-1

Formal Meeting & Review
Documentation

Approval (B &
D (vi);
Review all other

(A) as specified in
the CDRL
(B, C, D) at
Review plus 1W

As Required (A/R)

Mission Integration
Interface Control Document

VADR 1-2A

(ICD)

Approval

VADR 1-2B Mission Success
Determination Methodology
Interface Control Document
VADR 1-3A (ICD) Requirements
Verification Matrix

Approval

VADR 1-4

Review

Launch Vehicle Schedules

Approval

Preliminary ICD at Baseline ICD at MSDR

ATP + 3M

and
A/R

NLT L-4M

As Changed

MSDR

A/R or with each ICD
revision

ATP + 3M

L-6M, A/R

ATP+TBP

L-9M, A/R