Attachment 3: to Instructions - Offeror Exp Form
Updated
A PDF document (378 KB) attached to Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas), from the Department of the Army. Due Oct 26, 2026, 10:00 AM (UTC-5).
File name: Attachment 3 to Instructions - Offeror Exp Form.pdf
The full file is for paid members, or buy this bid alone.
Preview
[REQUIRED FORM. SUBMIT ONE FORM FOR EACH PAST PROJECT (SEE RFP PARAGRAPHS 3.1.2 TO 3.1.7).]
ATTACHMENT 3 TO PHASE 1 RFP
OFFEROR’S EXPERIENCE FORM
PROJECT TITLE:
TYPE OF PAST PERFORMANCE EVALUATION FOR THIS PROJECT:
☐ CPARS (previously completed by the Government); or
☐ Past Performance Questionnaire (completed by Offeror’s customer--see Attachment 4)
FINAL CONTRACT AMOUNT (U.S. DOLLAR):
(Note: Contracts with an amount less than $50,000 should NOT be submitted).
CONTRACT DURATION (PERIOD OF PERFORMANCE):
(If not complete, provide % currently complete)
PROJECT DELIVERY METHOD (DESIGN-BID-BUILD, DESIGN-BUILD, ETC.):
WHAT ROLE DID THE PROPOSING FIRM HAVE IN THIS PROJECT? (Prime contractor
or key subcontractor. If a subcontractor, state who is the prime contractor. State if the example project represents a joint venture. If a joint venture, name the joint venture’s parties. Indicate type of work and percentage of work performed by the parties.)
DESCRIPTION OF THE PROJECT’S SCOPE AND MAGNITUDE: (The description should provide sufficient detail to demonstrate the similarities with the proposed project.)
*** DO NOT INCLUDE ANY LINKS OR REFERENCES TO OTHER SUBMISSIONS ***
(Description of Project, Continued. ***Do not submit more than ONE continuation page per project. If multiple continuation pages are submitted for a project, only the first one will be considered.)
*** DO NOT INCLUDE ANY LINKS OR REFERENCES TO OTHER SUBMISSIONS ***
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: to Instructions - Vendor Info Form
- Attachment 2: to Instructions - Letter of Commitment
- Attachment 4: to Instructions - Past Performance Questionnaire Form
- Attachment 5: to Instructions - Tech Approach and Qualifications
- Solicitation Attachment A - INSTRUCTIONS
- B 08 03 Solicitation Amendment