Attachment 3: Performance Work Statement
Updated
A PDF document (241 KB) attached to Paint Services in support of the HC-144 Aircraft., from the US Coast Guard. Due Nov 23, 2026, 4:00 PM (UTC-5).
File name: Attachment 3 - Performance Work Statement.pdf
The full file is for paid members, or buy this bid alone.
Preview
70Z03827QL0000005
PERFORMANCE WORK STATEMENT
Paint Services in Support of the HC-144 Aircraft
1.0
2.0
3.0
4.0
5.0
6.0
12.0
13.0
14.0
BACKGROUND
SERVICES
APPLICABLE DOCUMENTS
MAINTENANCE REQUIREMENTS
DELIVERY SCHEDULE
PERFORMANCE REQUIREMENTS
6.1
CONTRACTOR
6.2
U. S. COAST GUARD (USCG)
MINOR MAINTENANCE
QUALITY ASSURANCE
GOVERNMENT FURNISHED MATERIALS
DELIVERABLES
INSPECTION and ACCEPTANCE
11.1 USCG ON SITE INSPECTION
11.2 INSPECTION AND ACCEPTANCE CRITERIA
MEETINGS
TRAVEL
USCG POINT OF CONTACT (POC)
1.0
BACKGROUND:
7.0
8.0
9.0
10.0
11.0
The USCG operates eighteen HC-144 (CN-235, series 300M) aircraft manufactured by Airbus Military, Seville, Spain. The base CASA CN-235M aircraft provided the foundation; changes to the configuration and the addition of supplementary systems have been combined resulting in the 300M series CG01 version of the CN-235M, the USCG HC-144 Maritime Patrol Aircraft. These aircraft became operational in 2008, undergo Programmed Depot Maintenance Inspection (PDM) at USCG Aviation Logistics Center (ALC) every four (4) years, and will require external paint refurbishment. The USCG’s missions consistently expose these aircraft to harsh saltwater environments.
2.0
SERVICES:
2.1
Contractor shall be a Federal Aviation Administration (FAA) certified 145 center with an onsite de-paint and paint facility with the capabilities and equipment to perform minor aircraft maintenance as described in paragraph 7.0.
2.2
The contractor shall provide all services necessary to prepare, scuff sand or de-paint coatings, and externally paint the HC-144 aircraft, or other USCG airframes, in accordance with (IAW) the following. For HC-144 aircraft: ALC’s HC-144 paint drawings 1100-11-1 (Paint and Detail Drawing) and
70Z03827QL0000005
1100-11-2 (Exterior Placards and Markings Stencils), Government published standards, CN-235 technical orders applicable to the CN-235 Model 300M Series CG01 version, and associated maintenance requirements listed in this performance work statement. Best commercial practices may be employed upon approval of USCG Engineering.
Note 1: The USCG will inspect and paint the following areas during depot maintenance: Engines (propeller cap, and propellers), interior and frames of crew entrance doors, escape hatches and cargo ramp, landing gear and interior landing gear wells, flight control surfaces (ailerons, elevators, rudder, flaps) and their leading edge box structures, antennas and radomes during PDM. These areas do not require de-painting or painting by the
The beginning of the document. Download the full file to read on.