Home / Design and Construction of a Modernized Facility (Building… / Document

Attachment 3: Project Designs

Updated

A PDF document (2.1 MB) attached to Design and Construction of a Modernized Facility (Building 129 Lunch and Locker Room Facility) at McAlester Army Ammunition Plant (MCAAP), from the Department of the Army. Due Nov 23, 2026, 12:00 PM (UTC-6).

File name: Attachment 0003 - Project_Designs.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

A
NG
E
NE
GI
EN

I
RE
C
OR
AT
EO
F

I

N

McALESTER ARMY AMMUNITION PLANT

M

PLATE

NO.

SHEET

NO.

SHEET

TITLE

G-CVR

COVER SHEET

G-101

SCOPE & PHASING PLAN

C-101

CIVIL SITE PLAN

A-101

OVERALL FLOOR PLANS

A-102

CENTRAL BLOCK FLOOR PLAN

A-103

EAST WING FLOOR PLAN - FLOOR 1

A-105

EAST WING FLOOR PLAN - FLOOR 2

A-106

WEST WING FLOOR PLAN

RK

CA

DATE

I

M

MC
AA
PD
I
RE
TO
RA
TE
OF

SHEET INDEX

ND
PU
BI

D

S

C

I

RI

WO
LC

S
RK
WO
LC
UB
DP
AN
NG
EER
GN
EN

P

AP

T

MEDIUM CALIBER AREA

FACILITY NO. 129

DESCRIPTION

L

BUILDING RENOVATION

10 JUL 2026

DRAWING NO.:

2025-016

WORK ORDER NO.:

A. ALEXANDER

DRAWN BY:

R. PEASLEE

CHECKED BY:

J

IJO 62099

ISSUE DATE:

DESIGNED BY:

MARK

K

ANSI D

SIZE:

McALESTER, OK 74501

1 C TREE ROAD, BLDG 419

SUBMITTED BY:

FACILITIES ENGINEERING OFFICE

F

BUSINESS & PLANNING DIVISION

McALESTER ARMY AMMUNITION PLANT

G

PUBLIC WORKS DIRECTORATE

H

E

MICROSTATION CE (DGN)

DRAWING NO.:

B

A

2025-016

PROJECT FUNDING STATUS:

WORK ORDER NO.:IJO 62099

TOTAL PROJECT AREA:

ISSUE DATE:

PROJECT DESCRIPTION:

10 AUG 2026

< ONE (1) ACRE

RECORD OF ENV. CONSIDERATION (REC):

FUNDED

NOT FUNDED

< FIVE (5) ACRES

> FIVE (5) ACRES

REQUIRED

NOT REQUIRED

THIS PROJECT CONSISTS OF THE RENOVATION OF BUILDING 129 TO PROVIDE A QUALITY WORK ENVIRONMENT FOR PRODUCTION LINE EMPLOYEES BY PERFORMING NEEDED MAINTENANCE AND IMPROVING THE BUILDING LAYOUT AND PROVIDING MORE MODERN FINISHES, FIXTURES, AND APPLIANCES. SOME PORTIONS OF THE ARE PROPOSED TO BE REPAIRED BY REPLACEMENT BY DEMOLITION AND REBUILDING.

COVER SHEET

BUILDING RENOVATION

ALL COPIES OF THIS DRAWING ARE TO BE DESTROYED AFTER INITIAL USE OR WHEN LATER REVISIONS BECOME AVAILABLE. USER SHALL ENSURE THAT COPIES OF THIS DRAWING ARE THE LATEST VERSION PRIOR TO USING.

C

FACILITY NO. 129

ORIGINAL

MEDIUM CALIBER AREA

CONCEPT DEVELOPMENT

D

SHEET ID

2026-016

G-CVR

CONCEPT DEVELOPMENT

CAD FORMAT:

ORIGINAL

APPROVAL SIGNATURES ON FILE

I
RE
C
OR
AT
EO
F

EXISTING BUILDING:

T

P

27'-3"

10'-0"

M

ND
PU
BI

D

RK

CA

S

STRUCTURAL CHARACTERISTICS: REINFORCED CONCRETE FRAME,

CONCRETE & STRUCTURAL CLAY TILE MASONRY FLOORS & ROOF, BRICK

VENEER EXTERIOR SHELL, AND STRUCUTRAL CLAY TILE INTERIOR WALLS.

RI

WO
LC

AP

1.

A
NG
E
NE
GI
EN

GENERAL NOTES

CONCRETE SLAB-ON-GRADE IN LOWER LEVELS AND STEAM PIT; ELEVATED

FLOOR AND CRAWLSPACE IN CENTRAL BLOCK.

66'-9"

BUILDING AREAS:

UP

DATE

DN

TOTAL FOOTPRINT: 17,476 SQ. FT.
TOTAL INTERIOR: 24,310 SQ. FT.

16'-9"

N

GROUND FLOOR: 9,194 SQ. FT.
WEST UPPER LEVEL: 3,198 SQ. FT.
EAST UPPER LEVEL: 4,107 SQ. FT.

The beginning of the document. Download the full file to read on.

Other documents in this bid