Attachment 3:
Quality Assurance Surveillance Plan (QASP)

The following Performance Requirement Services Summary identifies the performance objective and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold describes the minimum acceptable levels of service required for each requirement. The Performance Requirements Summary shall not take the place of the PWS. These thresholds are critical to mission success.

Performance Objective
Standard
Performance Threshold Maximum Allowable Degree of deviation requirement Method of Surveillance
Testing, Inspection, and Maintenance Service frequency/interval Testing, Inspection, and Maintenance of Electrical Equipment Per Inspection Interval in PWS No deviations. All requirements mandated by law or regulation must be 100% compliant 100% inspection
to ensure that PWS
requirement is
achieved

2. Reports

All reports are accurate, complete, and submitted on time per the PWS

100 % of the
time. No
discrepancies are
allowed.
100% inspection
to ensure that PWS
requirement is
achieved

3. Emergency / Call back services

Response time within the time frame listed in the PWS
100 % of the time. No discrepancies are allowed.
100% inspection
to ensure that PWS
requirement is
achieved

4. Use of qualified personnel

All personnel shall meet the certification/licensure requirement in the PWS 100% of the time. No discrepancies are allowed
100% inspection
to ensure that PWS
requirement is
achieved