ITEM

EST.

UNIT

TOTAL

NO.

DESCRIPTION

QUANTITY UNIT

PRICE

PRICE

Chadwick Motorcycle and ATV Use Area – this is a complex that is comprised of Cobb Ridge Campground, Ava/Cassville/Willow Springs Ranger District, Christian County, Missouri; that has a total of 2 double toilet vault buildings, 2 host site vaults, and one flush/shower house vault and 2 day use areas(KC Pavilion and Camp Ridge) with a double toilet vault building each. The following is the individual breakdown of each toilet
1A
Vault Toilet Waste Pumping and Disposal – Cobb Ridge Campground Vault Building C (1 double toilet vault buildings, 500 gallon each toilet, 1,000 gallons total) Up to two service/year

1B

1C

1D

1E

Base Year – 01/01/2027 to 12/31/2027
EA
$
$
OYI – 01/01/2028 to 12/31/2028
EA
$
$
OY2 – 01/01/2029 to 12/31/2029
EA
$
$
OY3 – 01/01/2030 to 12/31/2030
EA
$
$
OY4 – 01/01/2031 to 12/31/2031
EA
$
$
Vault Toilet Waste Pumping and Disposal – Cobb Ridge Campground Vault Building E (1 double toilet vault buildings, 500 gallon each toilet, 1,000 gallons total) Up to two service/year Base Year – 01/01/2027 to 12/31/2027
EA
$
$
OYI – 01/01/2028 to 12/31/2028
EA
$
$
OY2 – 01/01/2029 to 12/31/2029
EA
$
$
OY3 – 01/01/2030 to 12/31/2030
EA
$
$
OY4 – 01/01/2031 to 12/31/2031
EA
$
$
Vault Toilet Waste Pumping and Disposal – Cobb Ridge Shower/Flush Toilets (Two 2,000 gallon tanks, 4,000 gallons total); Up to two service/year Base Year – 01/01/2027 to 12/31/2027
EA
$
$
OYI – 01/01/2028 to 12/31/2028
EA
$
$
OY2 – 01/01/2029 to 12/31/2029
EA
$
$
OY3 – 01/01/2030 to 12/31/2030
EA
$
$
OY4 – 01/01/2031 to 12/31/2031
EA
$
$
Vault Toilet Waste Pumping and Disposal – Camp Ridge Day Use (1 double toilet vault buildings, 500 gallon each toilet, 1,000 gallons total), Up to two service/year Base Year – 01/01/2027 to 12/31/2027
EA
$
$
OYI – 01/01/2028 to 12/31/2028
EA
$
$
OY2 – 01/01/2029 to 12/31/2029
EA
$
$
OY3 – 01/01/2030 to 12/31/2030
EA
$
$
OY4 – 01/01/2031 to 12/31/2031
EA
$
$
Vault Toilet Waste Pumping and Disposal – KC Pavilion Day Use (1 double toilet vault buildings, 500 gallon each toilet, 1,000 gallons total), Up to two service/year Base Year – 01/01/2027 to 12/31/2027
EA
$
$
OYI – 01/01/2028 to 12/31/2028
EA
$
$
OY2 – 01/01/2029 to 12/31/2029
EA