Home / Outdoor Fitness Facility, Building 389— Supply, Delivery… / Document

Attachment 3: Specifications 26 41 01.00 10 Lightning Protection System

Updated

A PDF document (107 KB) attached to Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support, from the Department of the Air Force. Due Nov 26, 2026, 5:00 PM (UTC-5).

File name: Attachment 3 Spec 26 41 01.00 10 Lightning Protection System.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SECTION 26 41 01.00 10

LIGHTNING PROTECTION SYSTEM

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

o NFPA 70 (2014; AMD 1 2013; Errata 2013; AMD 2 2013) National Electrical Code o NFPA 780 (2014) Installation of Lightning Protection Systems

UNDERWRITERS LABORATORIES (UL)

o UL 467 (2007) Grounding and Bonding Equipment
o UL 96 (2005; Reprint Sep 2013) Lightning Protection Components o UL Electrical Construction (2012) Electrical Construction Equipment Directory

1.2 SUBMITTALS

The following shall be submitted in accordance with the SCOPE OF WORK: SD-02 Shop Drawings
o Installation drawings, as specified.
SD-07 Certificates
o Component UL Listed and Labeled

1.3 GENERAL REQUIREMENTS

1.3.1 Verification of Dimensions

The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before performing the work. No departures shall be made without the prior approval of the Contracting Officer.

SECTION 26 41 01.00 10 – Page 1

1.3.2 Installation Drawings

Where new/replaced or modified LPS is stated or indicated, submit installation shop drawing for the overall lightning protection system. Include on the drawings the physical layout of the equipment (plan view and elevations), mounting details, relationship to other parts of the work, and wiring diagrams. Include manufacturer's descriptive and technical literature, catalog cuts, drawings, and installation instructions. Detail drawings shall demonstrate that the system has been coordinated and will function as a unit. Drawings shall show proposed layout and mounting and relationship to other parts of the work.

1.3.3 Component UL Listed and Labeled

Where new/replaced or modified LPS is stated or indicated, submit proof of compliance that components are UL Listed and Labeled. Listing alone in UL Electrical Construction, which is the UL Electrical Construction Directory, is not acceptable evidence. In lieu of Listed and Labeled, submit written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that items have been tested and conform to requirements and testing methods of Underwriters Laboratories.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide a system consisting of the standard products of a manufacturer regularly engaged in

The beginning of the document. Download the full file to read on.

Other documents in this bid