Attachment 3: Specifications Powell Duplex
Updated
A PDF document (1.3 MB) attached to GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest, from the Forest Service. Due Nov 13, 2026, 5:00 PM (UTC-7).
File name: C04 Attachment 3 - Specifications Powell Duplex.pdf
The full file is for paid members, or buy this bid alone.
Preview
PROJECT MANUAL FOR:
GAOA POWELL DUPLEX
IMPROVEMENTS
Volume 1of 1
Date: July 19, 2024
100% CD Specifications
ARCHITECT
MOSAIC ARCHITECTURE, P.C.
317 North Cruse Ave, Suite 201
Helena, Montana 59601
www.mosaicarch.com
SECTION 00 0110
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A.
01 3000 - Administrative Requirements
B.
01 5000 - Temporary Facilities and Controls
C.
01 7000 - Execution and Closeout Requirements
D.
01 7419 - Construction Waste Management and Disposal
2.02 DIVISION 02 -- EXISTING CONDITIONS
A.
02 4100 - Demolition
B.
02 4113
Selective Site Demolition
2.03 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A.
06 1000 - Rough Carpentry
B.
06 1219 - Structural Insulated Panels
C.
06 2000 - Finish Carpentry
2.04 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A.
07 2100 - Thermal Insulation
B.
07 2500 - Weather Barriers
C.
07 4113 - Metal Roof Panels
D.
07 4623 - Wood Siding
E.
07 6200 - Sheet Metal Flashing and Trim
F.
07 9200 - Joint Sealants
2.05 DIVISION 08 -- OPENINGS
A.
08 1118 - Residential Steel Doors
B.
08 7100 - Door Hardware
2.06 DIVISION 09 -- FINISHES
A.
09 2116 - Gypsum Board Assemblies
B.
09 6516.23 - Resilient Flooring
C.
09 6816 - Sheet Carpeting
D.
09 9000 - Painting and Coating
2.07 DIVISION 10 -- SPECIALTIES
A.
10 3100 - Manufactured Fireplaces
2.08 DIVISION 22 -- PLUMBING
A.
22 0000 - General Requirements of Plumbing and HVAC
B.
22 0500 - General Provision of Plumbing and HVAC
C.
22 4100 - Plumbing Fixtures
2.09 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A.
23 8231
Heaters
2.10 DIVISION 26 -- ELECTRICAL
A.
26 0010 - General Electrical Requirements
28621 / USFS Powell Duplex
Improvements
00 0110 - 1
B.
26 0505 - Selective Demolition for Electrical
C.
26 0519 - Low-Voltage Electrical Power Conductors and Cables
D.
26 0533 - Raceways and Boxes for Electrical Systems
E.
26 2726 - Wiring Devices
F.
26 5110
LED Lighting
28621 / USFS Powell Duplex
Improvements
00 0110 - 2
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A.
Electronic document submittals.
B.
Preconstruction meeting.
C.
Progress meetings.
D.
Construction progress schedule.
E.
Submittals for review, information, and project closeout.
F.
Requests for Interpretation (RFI) procedures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL
A.
All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format.
1. Besides submittals for review, information, and closeout, this procedure applies to
The beginning of the document. Download the full file to read on.