ATTACHMENT 3 – STATEMENT OF WORK (SOW) –
70Z03826QK0000014
1.0
General
1.1 The United States Coast Guard (USCG), Aviation Logistics Center (ALC) Industrial Operations Division (IOD) has a requirement to replace the existing Aircraft Electrical Component Test Stand (AECTS). The ALC supports multiple aircraft platforms, Short Range Recovery (SRR) H-65, Medium Range Recovery (MRR) MH-60T, Medium Range Surveillance (MRS) HC-144 and HC-27, and the Long Range Surveillance (LRS) C-130H and C-130J product lines. The purpose of AECTS is to perform complete tests and checkout of all power generation system components, including AC and DC, both air-cooled and oil-cooled systems including constant speed drive-generator packages.
The AETCS being offered must be factory new and possess the capability to support all designated platforms that are supported at ALC. The Contractor shall provide documentation that the AECTS offered meets the requirements outlined in the Technical Criteria (Attachment 2 – Technical Criteria – 70Z03826QK0000014).
2.0
Design Requirements:
The Contractor shall provide the following requirements for the AECTS replacement. Performance under this Purchase Order shall be performed at:
USCG Aviation Logistics Center
1664 Weeksville Road, Building 63
Elizabeth City, NC 27909
The Contractor shall perform all work between the hours of 7:00 a.m. and 3:30 p.m. Eastern Time (ET), Monday through Friday (except Federal holidays). However, there may be occasions when the USCG will require the work to be completed during other than normal business hours including weekends and holidays. In these instances, the USCG Contracting Officer (KO) will work with the Contractor to establish an agreed upon schedule.
2.1
Post Award Kickoff Meeting:
The Contractor shall conduct a site visit to ALC within ten (10) calendar days after Contract Award (DACA). The purpose of the Site Visit/Kickoff Meeting shall be to establish the framework of the Contractor and Government interaction during the performance period of the contract. The Contractor shall place emphasis on the schedule (milestones and deliverables), and each phase of the project. The site visit will be coordinated with the Supervisor, Technical POC (TPOC), and KO to facilitate the Contractor surveying the AETCS workspace. 2.2
Initial Design Review:
The Contractor shall provide an initial drawing package to the Government for review approximately sixty (60) DACA. The initial drawing package shall lay out the major design