Capital Program Management Capacity Study
Statement of Work (SOW)
Architect of the Capitol (AOC)
Office of the Chief Engineer
September 23, 2026
i
Statement of Work – Management Capacity Study
1.0
2.0
3.0
4.0
5.0
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
7.0
8.0
9.0
10.0
11.0
12.0
13.0
13.1
13.2
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
i
Statement of Work – Management Capacity Study
1.0
PROJECT TITLE
Capital Program Management Capacity Study
2.0
BACKGROUND
Established as a permanent office in 1876, the Architect is provided permanent authority for the care and maintenance of the United States Capitol based on Section 1811 of Title 2 of the United States Code. The Architect is responsible for the maintenance, operation, development and preservation of 18.4 million square feet of buildings and more than 570 acres of land throughout Capitol Hill. This includes the U.S. Capitol, House and Senate office buildings, the U.S. Capitol Visitor Center, the Library of Congress, the Supreme Court of the United States, the U.S. Botanic Garden, the Capitol Power Plant, and other facilities. The Architect also provides professional expertise with regard to the preservation of architectural and artistic elements entrusted to his care and provides recommendations concerning design, construction and maintenance of the facilities and grounds.
3.0
SCOPE OF WORK
The AOC requires an assessment to achieve predictable success in executing its aggressive capital program. Goals are to:
•
Provide appropriate governance and oversight to ensure projects are on plan
•
Ensure a disciplined approach to project management by applying industry standards and conducting continuous evaluations and improvement of project management processes, standards, and tools,
•
Ensure timely, accurate, and consistent project program and portfolio status reporting
•
Ensure the necessary level of stakeholder engagement given the size and complexity of the AOC’s Capitol Program
4.0
APPLICABLE POLICIES AND STANDARDS
Scope areas may be derived from the following::
•
•
•
•
•
•
•
•
•
•
•
•
AOC Contracting Manual (Order 34-1)
Project Management Manual
Design Standards
A/E Design Manual
Preservation Policy and Standards
Architectural Review Board Charter
Universal Accessibility Policy
BIM Guide
Capitol Complex Master Plan
Annual Project Submission Guidelines for LICP
Project Risk Management Program
Internal Control Program (Order 4-10) 3/2016
The contractor shall not deviate from any of the above documents without express approval granted by the