Home / Solicitation: 415 SCMS Strategic Mac IDIQ Contract / Document

Attachment 4: Performance Work Statement Performance Work Statement

Updated

A PDF document (265 KB) attached to Solicitation: 415 SCMS Strategic Mac IDIQ Contract, from the Department of the Air Force. Due Dec 1, 2026, 12:00 PM (UTC-7).

File name: Attachment_4_Performance_Work_Statement_PWS_17DEC25.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820

PERFORMANCE WORK STATEMENT (PWS)

Revision Record
Date

Changes

17 December 2025

Initial Release

Solicitation No.

Date

FA8250-26-R-0001

13 January 2026

1.0

CONTRACT TYPE: Firm Fixed Price (FFP) Multiple Award Contract (MAC) Indefinite Delivery, Indefinite Quantity (IDIQ). MAC IDIQs are appropriate for use when the Government has a known requirement, but the exact timing or occurrence of the requirement cannot be identified. MAC IDIQs are awarded to multiple awardees using FAR 15.3 source selection procedures, with the intent to conduct fair opportunity task order competitions among the awardees in accordance with (IAW) FAR 16.505(b)(1). 1.1 PURPOSE: This performance work statement (PWS) describes the technical and administrative requirements necessary to establish a MAC IDIQ that provides repairs for existing and future assets in support of 415 SCMS and its programs/systems (MINIMUTES, JTE, MUTES, CRC, GPS, TRTG, BANDSIM, UMTE, MILSATCOM/SEON, MWD, SCS, SOON, SBIRS).
1.2 OBJECTIVES: Contractors shall comply with all requirements set forth in the Basic IDIQ, PWS as well as specific requirements designated in individual task orders. The task orders will focus on the following primary objectives: 1.2.1

The contractor shall accomplish the repair process and certify that all assets were refurbished/repaired IAW Federal Specifications, Technical Requirements and Engineering Drawings.

1.2.2

Repaired parts will conform to original drawings unless authorized in the applicable Technical Order(s). Any conflicts between an original drawing and the technical order(s) shall be resolved by the 415 SCMS utilizing the following process. The Procuring Contracting Officer (PCO) will submit final guidance to the contractor. Any deviation from the original drawing and pertinent technical order(s) shall be requested in writing by the contractor to the 415 SCMS and PCO and will require approval to proceed with a deviation from the cognizant Air Force (AF) authority.

17 Dec 2025

Performance Work Statement (PWS)

1.2.3

In the event that laws, regulations, technical order(s), or Air Force Instructions (AFI) change during the term of this contract, a modification to incorporate the changes will be issued by the PCO and the contractor will be required to comply as such changes come into effect.

1.3 SCOPE OF WORK: The scope of this MAC IDIQ includes, but is not limited to, Test, Teardown and Evaluation (TT&E), Minor Repair(s), Major Repair(s), Total Rebuild(s),

The beginning of the document. Download the full file to read on.

Other documents in this bid