Attachment 4: Statement of Work Supplemental Requirements
Updated
A PDF document (550 KB) attached to Resilient Open & Agile Avionics System & Technology Development (ROAASTD), from the Department of the Air Force. Due Apr 19, 2028, 5:00 PM (UTC-4).
File name: Att 4 - SOW Supplemental Requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA8650-23-S-1031
Attachment 6
Statement of Work (SOW)
Supplemental Requirements (AFRL/PZL)
27 March 2023
The following paragraphs are also considered be a part of the SOW requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW.
1. Implementation of Disclosure of Information:
In order to comply with DFARS 252.204-7000, Disclosure of Information, the following copies of the information to be released are required at least 50 days prior to the scheduled release date: a. One (1) copy to: Rachel Pyle, [email protected], Contracting Officer b. One (1) copy to: Edwin (Gordon) Strong, [email protected], Program Manager
2. Key Positions and Minimum Qualifications:
a. Contractor personnel holding the position titles and having the qualifications listed below are considered essential to the work being performed under this contract: Key Positions:
TBD
Minimum Qualifications:
TBD
b. The Contractor shall notify the Contracting Officer before the departure of any individual in a key position and identify the proposed substitution. Any proposed personnel substitution that does not meet the minimum qualification requirements described above requires the prior written approval of the Contracting Officer.
3. Packaging and Marking:
a. All hardware deliverable contract items shall be packaged in accordance with established commercial practices.
b. When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters:
INSTRUCTION TO RECEIVING OFFICE – DO NOT OPEN; CONTENTS ARE
SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR HANDLED. CONTACT
THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON
RECEIPT. CONTACT INFORMATION: Gordon Strong, [email protected], (937) 713-8069
4. Program Manager:
The Government Program Manager for this effort is Gordon Strong, [email protected].
5. Program Focal Points:
The individuals listed below are identified as focal points for this contract. Principal Investigator: TBD
Technical Contract Manager: TBD
Alternate: TBD
6. Base Support:
Base support may be provided by the Government to the Contractor in accordance with this SOW. a. The Contractor will require use of base support on a rent-free, non-interference basis to include Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the
The beginning of the document. Download the full file to read on.