Attachment 5 91st Cyber Ops Center Div 01 Specifications Draft

Updated

A PDF document (1.8 MB) attached to 91st Cyber Operations Center – Progressive Design-Build Other Transaction Agreement, from the Department of the Army. Due Nov 17, 2026, 2:00 AM (UTC-6).

File name: Attachment 5_91st Cyber Ops Center Div 01 Specifications_Draft.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

OTA Specifications

DRAFT

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 14 00

01 30 00

01 32 01.00 10

01 33 00

01 33 16.00 10

01 35 26

01 42 00

01 45 00

01 45 00.15 10

01 45 00.25 10

01 45 35

01 50 00

01 57 19

01 58 00

01 78 00

01 78 23

01 78 24.00 10

01 91 00.15

SUMMARY OF WORK

WORK RESTRICTIONS

ADMINISTRATIVE REQUIREMENTS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

DESIGN DATA (DESIGN AFTER AWARD)

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

CONSTRUCTION MANAGEMENT PLATFORM (CMP)

SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY DATA REQUIREMENTS

BUILDING COMMISSIONING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

OTA Specifications

DRAFT

SECTION 01 11 00

SUMMARY OF WORK

PART 1

1.1

GENERAL

SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for ContractorDesign-Builder Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with

Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals
1.2
1.2.1

WORK COVERED BY CONTRACTAGREEMENT DOCUMENTS

Project Description

1.2.2

Location

location will be shown by the ContractingAgreements Officer. 1.3

The exact

OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract Agreement.[ Occupancy notifications will be posted in a prominent location in the work area.]
Before work is started, arrange with the ContractingAgreements Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. [1.4

EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the ContractingAgreements Officer. At the completion of operations, existing work must be in a condition equal to or better than that which

The beginning of the document. Download the full file to read on.