Attachment 5 91st Cyber Ops Center Div 01 Specifications Draft
Updated
A PDF document (1.8 MB) attached to 91st Cyber Operations Center – Progressive Design-Build Other Transaction Agreement, from the Department of the Army. Due Nov 17, 2026, 2:00 AM (UTC-6).
File name: Attachment 5_91st Cyber Ops Center Div 01 Specifications_Draft.pdf
The full file is for paid members, or buy this bid alone.
Preview
OTA Specifications
DRAFT
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 30 00
01 32 01.00 10
01 33 00
01 33 16.00 10
01 35 26
01 42 00
01 45 00
01 45 00.15 10
01 45 00.25 10
01 45 35
01 50 00
01 57 19
01 58 00
01 78 00
01 78 23
01 78 24.00 10
01 91 00.15
SUMMARY OF WORK
WORK RESTRICTIONS
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
DESIGN DATA (DESIGN AFTER AWARD)
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
CONSTRUCTION MANAGEMENT PLATFORM (CMP)
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA REQUIREMENTS
BUILDING COMMISSIONING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
OTA Specifications
DRAFT
SECTION 01 11 00
SUMMARY OF WORK
PART 1
1.1
GENERAL
SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for ContractorDesign-Builder Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with
Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
1.2
1.2.1
WORK COVERED BY CONTRACTAGREEMENT DOCUMENTS
Project Description
1.2.2
Location
location will be shown by the ContractingAgreements Officer. 1.3
The exact
OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract Agreement.[ Occupancy notifications will be posted in a prominent location in the work area.]
Before work is started, arrange with the ContractingAgreements Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. [1.4
EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the ContractingAgreements Officer. At the completion of operations, existing work must be in a condition equal to or better than that which
The beginning of the document. Download the full file to read on.