Home / GRTE 237343 - Rehab 4 Lazy F Ranch / Document

Attachment 5: GRTE - Combined Lead Based Paint Report 999-5237

Updated

A PDF document (18.8 MB) attached to GRTE 237343 - Rehab 4 Lazy F Ranch, from the National Park Service. Due Nov 20, 2026, 5:00 PM (UTC-5).

File name: B08_Attachment_05_GRTE_237343_-_Combined_Lead_Based_Paint_Report_999-5237.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Billings, MT ♦ Helena, MT

201 South 30th Street
Billings, Montana 59101
Phone: 406/245-7766
FAX: 406/254-1428

July 8, 2025
Ms. Laura Landon
Hennebery Eddy Architects, Inc.
921 SW Washinton Street, Suite 250
Portland, OR 97205
RE:

Lead-Based Paint Survey 12 Buildings

4 Lazy F Ranch

4 Lazy F Ranch Road

Moose, Wyoming
Northern Industrial Hygiene Project No. 999-5237

Dear Ms. Landon:
This letter report provides the summarized results of the lead-based paint (LBP) survey conducted by Chris Hust of Northern Industrial Hygiene, Inc. (Northern) on May 20, 2025, and May 21, 2025, at the above referenced site. The survey was conducted to identify potential LBP and lead-containing paint (LCP) that may be present on the interior and exterior finishes of the 12 buildings that will be impacted by the upcoming renovation project. Overview of Buildings
Harry’s Cabin
The building is a one-story wood siding, with a concrete masonry unit (CMU) block foundation, and a pitched roof. The building was moved to the site in 1954 but the construction date of the building is unknow. The building was previously used for housing. Typical interior building materials include vinyl sheet and wood finished floors, log finished walls and wood finished ceilings. Base finishes were not present on the lower walls. Exterior building finish materials consist of log siding and a rolled asphalt roofing. Both the walls and the roof are not insulated.
The building is heated by a wood burning fireplace. Water lines of the building are not insulated.
George’s Cabin
The building is a one-story wood siding, with a concrete masonry unit (CMU) block foundation, and a pitched roof. The building was constructed between 1927-1930’s. The building was previously used for housing.
Typical interior building materials include vinyl sheet and wood finished floors, log finished walls and wood finished ceilings. Base finishes were not present on the lower walls.

Asbestos • Lead-Based • Paint • Industrial Hygiene • Indoor Air Quality

Lead-Based Paint Survey

12 Buildings

4 Lazy F Ranch

Moose, Wyoming
July 8, 2025

Exterior building finish materials consist of log siding and a rolled asphalt roofing. Both the walls and the roof are not insulated.
The building is heated by a wood burning fireplace. Water lines of the building are not insulated.
End Cabin
The building is a one-story wood siding, with a concrete masonry unit (CMU) block foundation, and a pitched roof. The building was constructed in 1927. The building was previously used for