Attachment 5: Installation Support Requirements
Updated
A PDF document (87 KB) attached to Fort Rucker Aviation Maintenance (FRAM II) Solicitation Notice, from the Department of the Army. Due Oct 30, 2026, 11:00 AM (UTC-5).
File name: Attachment 0005 - Installation Support Requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
ATTACHMENT 0005 INSTALLATION SUPPORT REQUIREMENTS
v1.1 7APR26
1. The table below lists the requirements supporting Attachment 0001, PWS Paragraph 2.8.4. Installation Support Requirements The Contractor shall provide support when as directed by the COR or KO supporting Fort Rucker requirements.
ORGANIZATION
LOCATION
United States Army
Aeromedical Research
Laboratory (USAARL)
LOWE AHP
Fort Rucker Museum
Museum/TSF
Fort Rucker Garrison/Tenant
Units
Fort Rucker
T2COM/AVCOE
Fort Rucker
Fort Rucker Aircraft
Maintenance Contractor (FRAM Contractor Facilities
II )
SUPPORT REQUIREMENT
All required Field and approved
sustainment level maintenance for
USAARL HH-60M located at Lowe
AHP.
Loading/unloading and ground
movement of museum aircraft and
associated equipment; aircraft and
component maintenance support;
AMSS Fabrication Support;
Equipment support approved by
AVCOE.
Equipment support for scheduled
Installation events or supported
community activities; maintenance,
material movement and fabrication
/alteration support.
Support for T2COM/AVCOE directed
requirements.
Provide Fire Guards for Contractor
facilities housing aircraft during Fire
Alarm system outages.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 9: Government Oversight Team
- Attachment 13: Quality Assurance Surveillance Plan
- Attachment 1: Performance Work Statement
- Attachment 4: Document Summary List
- Attachment 8: Facilities Listing
- Attachment 14: Facilities Guide
- Attachment 17: Collective Bargaining Agreement
- Conformed Solicitation and Amendment