Home / Fort Rucker Aviation Maintenance (FRAM II) Solicitation… / Document

Attachment 5: Installation Support Requirements

Updated

A PDF document (87 KB) attached to Fort Rucker Aviation Maintenance (FRAM II) Solicitation Notice, from the Department of the Army. Due Oct 30, 2026, 11:00 AM (UTC-5).

File name: Attachment 0005 - Installation Support Requirements.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ATTACHMENT 0005 INSTALLATION SUPPORT REQUIREMENTS

v1.1 7APR26

1. The table below lists the requirements supporting Attachment 0001, PWS Paragraph 2.8.4. Installation Support Requirements The Contractor shall provide support when as directed by the COR or KO supporting Fort Rucker requirements.

ORGANIZATION

LOCATION

United States Army
Aeromedical Research
Laboratory (USAARL)

LOWE AHP

Fort Rucker Museum

Museum/TSF

Fort Rucker Garrison/Tenant
Units

Fort Rucker

T2COM/AVCOE

Fort Rucker

Fort Rucker Aircraft
Maintenance Contractor (FRAM Contractor Facilities
II )

SUPPORT REQUIREMENT

All required Field and approved
sustainment level maintenance for
USAARL HH-60M located at Lowe
AHP.
Loading/unloading and ground
movement of museum aircraft and
associated equipment; aircraft and
component maintenance support;
AMSS Fabrication Support;
Equipment support approved by
AVCOE.
Equipment support for scheduled
Installation events or supported
community activities; maintenance,
material movement and fabrication
/alteration support.
Support for T2COM/AVCOE directed
requirements.
Provide Fire Guards for Contractor
facilities housing aircraft during Fire
Alarm system outages.

The beginning of the document. Download the full file to read on.

Other documents in this bid