Attachment 6: DRGs Mech Integrity Brine Analysis 0001
Updated
A PDF document (1.8 MB) attached to Injection Well Failure Mode Evaluation, from the Departmental Offices. Due Nov 13, 2026, 4:00 PM (UTC-7).
File name: Attachment_6-_DRGs_Mech_Integrity_Brine_Analysis_0001.pdf
The full file is for paid members, or buy this bid alone.
Preview
Paradox Valley Injection Well No.1 Montrose County, Colorado
. ·'.k:
Jo.;nch set at 65 feet BGL
30-inch by 20-inch annulus cemented to surface
..__ _
20-inch; 94 ppf; K-55: Big Omega set at211 feet BGL
Si7e
9-5/8
10.98
Capacities
BblfFt
0.070766
0.075228
5-1/2 (.361) 0.022177
Bbls
859. 1
53.0
65.7
5-112 (.304) 0.023248
298.6
498.7
9-518 X 5-l '2 0.040334
31.5
10.98x5-l '2 0.044796
Total Annulus Capacity
521.2
Tubing Capacity to !Ianger 298.6
Tubing Capacity to Top Perf 325.3
14--t;..- . ; . - - - - - 5 1/2-inch; 0.304-inch wall; 125 ksi; lncoloy C-276; BDS injection
tubing with mandrel hanger. Landed with I 0,000 lb slackoff. eal assembly has primary metaVmetal seal on pin flank and teflon backup seals
; .'
------Liner llanger top at 12,844 feet BGL (Texas Iron Works, Houston) ~ Paradox Salt 13, 120 to 13,570 feet BGL
.---.
:~
/
9 5/8-inch; 53.5 ppf; CYS-95 BD x I 0.98-inch; 115.2 ppf; MUST /
/
Mannesman set at 14,021 feet BGL. (10.98-inch from 12,139 to 13,835 feet across salt)
4-- - - - - - 5- l/2 Annulus Cemented to 13,100 feet (TOL Not Cemented)
PERFORATION (6-J PF, 20 gm)
Formation
Schlumberger depth
Upper Leadville
Middle Leadville
Lower Leadville/Ouray
McCracken
Ignacio
Precambrian
8/93 Fill
6/92 Fill
7·90 Bridge Plug
2 90 Perforator
14,080-14,185
14,215-14,350
14,380-14,504
14,651-14,719
15,376-15-386
15.489-15,827
PET depth
14,068-14, 173
14,203-14,338
14,360-14,492
5 I/2-inch; 0.361 and 0.304-inch wall; C-276: set at 15,90 I feet BGL
Original PBTD
~~llol
W[l&h1[3!(}
T ubular Ratin s
lllllnl 12nll!lnl U!.t.eli~ll !::J!IW..C!11!!l
9-q
53 s
I 535
8 500
9,410
7 ..330
1477
Ien" I~ (~·lbl
1091
115 2
1800
16.990
2091
23 I
4 778
·~
4 6SJ
16 <()()
S·l/2
17,230
13,480
S·1 '2
19 2
4 892
4 767
12.440
7 890
SUBSURFACE
PAH ALARM LEVEL
4950 PSIG
TO INJECTION PUMPS
SHUT DOWN LOGIC
PI
TI
PI
PIT
UA
IN
MANUAL
ALARM
UA
KS
INJECTION
PUMP START
PERMISSIVE
HS HC
340 340
OC MA
TE
1/2" VN-03-229
TI
FROM P-302A B,C & D
5°-K1-306-I
(15" ABOVE AND
BELOW TE 305)
YI
MANUAL / AUTO
YI
HC
PI
501A
PCV
PC
PSV
1/2" BV-507
PI
S
PI
AFCV-508
S
N 2 TANK #2
N 2 TANK #1
5" - K1-306
1/2" BV-504
AFCV-509
1/2" BV-506
PCV
VN-03-206 BLEED VALVE
5"-K1-306
PSV
1/2" BV-505
PI
500A
3/4" VN-03-203
EPA PORT
ZIO
ZLO ZLC
340 340
ZIC
ZIO
ZIC
PI
3/4" VN-03-230
VCG-03 UPPER MASTER CONTROL VALVE
PT
3/4" VN-03-204 340
VCG-04 LOWER MASTER CONTROL VALVE
3/4" VN-03-205
VCG-01
N2 BLADDER
VCG-02 SWAB VALVE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Statement of Work
- Attachment 3: Wage Determination
- Sol
- Questions and Answers 0001
- Amendment 1: Solicitation with Clauses and Provisions 0001
- Attachment 4- 2001 Report of Wireline Logging Operations 0001
- Attachment 5- 2010 Updated Est of Project Life 0001
- Attachment 7: Injection Data History through 0001
- Sol Amendment 0001