Attachment A 598-22-115 Upgrade Replace Site Utility Infrastructure-Statement of Work

Updated

A PDF document (190 KB) attached to 598-22-115 Site Utility Infrastructure-NLR, from the Department of Veterans Affairs. Due Jan 5, 2027, 4:00 PM (UTC-6).

File name: Attachment A_598-22-115 Upgrade Replace Site Utility Infrastructure-Statement of Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

CONSTRUCTION PACKAGE

FOR

Upgrade/Replace Site Utility Infrastructure-NLR
Water Package
598-22-115

Central Arkansas Veterans Healthcare System
VISN 16, Station 598
North Little Rock, Arkansas

Prepared By
CAVHS Planning and Design Office

1. DESCRIPTION OF WORK

A. Contractor shall completely prepare site for construction operations, including demolition, removal of existing structures, furnish labor and materials, and to perform the work in accordance with this description of work and the project plans and specifications. B. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project, employer, and restricted from unauthorized access.
C. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. D. The scope of this project includes upgrading the water source, storage, and site distribution system at the North Little Rock (NLR) Veterans Affairs Medical Center (VAMC) campus:
a. All work shall be done is a manner and sequence to minimize impact to the campus, patients, visitors and staff. No prolonged outages are permitted and any activity affecting the campus shall be coordinated in advance. See additional sections for detailed information.
b. The NLR campus is short of reserve water capacity. This project includes a new elevated water storage tank. The new tank installation shall include all labor and materials required for a complete and operational system including, but not limited to, supporting structure, piping, appurtenances, and accessories as required.
c. The existing elevated 250,000-gallon water tower shall be demolished in its entirety including all below grade supporting structure, piping vaults, etc. The demolition shall be in strict accordance with the phasing schedule. d. A new pump house with new pumps and new pump controls is included in this project. Physical and operational security, monitoring, controls, redundancy and emergency power are included. The new pump house installation shall include all labor and materials required for a complete and operational system including, but not limited to, structure, fence, paving, piping, cameras, access control, emergency generator, appurtenances, and accessories as required. e. A new automated control system that interlocks to and also controls the existing south pump house as well as the new north pump house is included in this

The beginning of the document. Download the full file to read on.