STATEMENT OF WORK

Electrical Upgrades to the Grant County Aerial Tanker Base & Fire Cache Gila National Forest, New Mexico

Construction Specifications

1. PROJECT OVERVIEW

•

This project consists of furnishing and installing a complete, code-compliant electrical distribution system to support a designated concrete pad area at the Grant County Aerial Fire Tanker Base and Fire Cache, and the upgrade of an existing electrical/motor control panel serving the retardant pumping system

The work includes:
-

The upgrade of an existing electrical/motor control panel serving the retardant pumping system
Extension of electrical service to a designated concrete pad area

The completed system shall be suitable for continuous outdoor service in a high-use industrial environment and designed for durability, safety, and future expansion.

2. APPLICABLE CODES AND STANDARDS

All work shall comply with:
•

NFPA 70 (National Electrical Code – NEC)

•

NFPA 70E (Electrical Safety)

•

NEMA standards

•

UL listing requirements

•

State of New Mexico electrical codes

•

Local Authority Having Jurisdiction (AHJ) requirements

•

USDA Forest Service engineering standards (as applicable)

127EAX27Q0015

Electrical Updates GCAFB

3. GENERAL REQUIREMENTS

The Contractor shall:
•

Furnish all labor, materials, equipment, and supervision

•

Perform a site verification walkdown prior to construction

•

Verify all existing electrical conditions and available capacity

•

Coordinate all work with the Contracting Officer’s Representative (COR)

Installation Quality
•

All materials shall be new, UL-listed, and rated for outdoor use

•

All installations shall be neat, workmanlike, and mechanically secure

Trenching & Surface Restoration
•

Minimize trenching where feasible by utilizing existing infrastructure

•

Restore all disturbed asphalt, concrete, or native surfaces to original condition

4. ELECTRICAL DISTRIBUTION SYSTEM

4.1 Source of Power

All new outlets shall be served from a new service pole, location subject to COR approval.

4.2 Load Design

The Contractor shall:
•

Perform NEC-compliant load calculations (Article 220)

•

Design for:
o

Existing loads

o

New receptacles

o

Minimum 25% spare capacity

4.3 Voltage Drop

•

Maximum:

127EAX27Q0015

Electrical Updates GCAFB
o

3% per branch circuit

o

5% total system

Conductor sizes shall be increased as required.

4.4 Wiring Methods

•

Above ground: EMT or Rigid Metal Conduit (RMC)

•

Underground:

•

o

Schedule 40 PVC (minimum)

o

Schedule 80 PVC at risers

Install pull strings in all conduits