Statement of Work
Mazak FUSE System
Date: November 4, 2026
Purpose
This document sets forth the Statement of Work (SOW) for services to be provided to UT-Battelle, LLC (Company), the managing and operating contractor for The Oak Ridge National Laboratory (ORNL), pursuant to a contract with the U.S. Department of Energy (DOE) on a project known as Research and Development on New Manufacturing Methods for Defense Castings and Forgings. Background
ORNL is DOE’s largest science and energy laboratory, located in Oak Ridge, Tennessee, and conducts research supporting energy, environmental, and national security missions. This procurement supports ORNL’s Manufacturing Demonstration Facility (MDF) in Knoxville, Tennessee. The project requires an integrated manufacturing system consisting of subtractive machining, wire arc additive manufacturing (WAAM), blank machine stations, pallet changer modules, and a two-level PALLETECH system with associated engineering and interfaces. The heat treatment module interface is included in this scope; however, the heat treatment module itself is outside this scope Objectives
The objectives of this subcontract are to:
1. Furnish a fully integrated Mazak FUSE manufacturing system for ORNL MDF. 2. Provide one subtractive machining station, one WAAM station, two blank machine stations, five pallet changer modules, and one two-level PALLETECH system with 32 pallets and associated connections and engineering.
3. Complete system engineering and configuration review sufficient to define layout, interfaces, installation prerequisites, utility requirements, and acceptance criteria. 4. Conduct pre-shipment runoff testing to verify the supplied equipment and integrated functions against the approved configuration.
5. Deliver, install, and support final acceptance of the system at ORNL MDF in Knoxville, Tennessee. 6. All provided items shall meet published performance specifications as stated by Mazak. Scope
The Seller shall furnish, configure, integrate, deliver, and install the Mazak FUSE system for ORNL MDF in Knoxville, Tennessee. The scope includes all equipment, engineering, configuration documentation, customized system layout, PMC-to-machine connection engineering, pallet handling integration, and the interface connection to the heat treatment module. The scope also includes runoff testing before shipment and installation support through final acceptance. The heat treatment module itself is not included in this subcontract. Scope defines the boundaries of the work; specific performance