Map #

Issue Description

Remediation

Dock driveway apron has
Repair driveway apron section via
sunk below sidewalk
jacking or replacement. If jacking,
slope, exposing sidewalk
material selection shall be
edge to snowplow damage
expected to perform to expected
and trip hazard. (approx
use.
350 sf)

Sidewalk edge damage
Repair sidewalk edge damage and
from plowing operations. level pad with surrounding.

Approximately 4 sections
of sidewalk will pool/ice
during wet/snow weather
events. (approx 280 sf)

Add concrete fill to widen plow area
at the sidewalk-ramp corner. Added
Sidewalk transition to
concrete shall be able to withstand
crosswalk ramp is too
weight of standard skid-steer. Raise
sharp for snowclearing
operations. (approx 30 sf) landscaping (as needed) to
minimize sidewalk drop-off.

Repair sunken sidewalk sections to
level to prevent icing/ponding.
Repair shall be able to withstand
weight of standard skid-steer.

Picture

Sidewalk square is
cracked with a chunk
missing. (approx 60 sf)

Replace sidewalk pad. Sidewalk
pad shall be able to withstand
weight of standard skid-steer.

Concrete top/curb of
storm drain has been
chipped/chunked.

Patch/repair curbing.

- Remove two (2) existing French drains and
replace with 6" and 4" drains under the
sidewalk. Patch sidewalk with concrete to
match existing sidewalk elevations.

Water intrusion after
heavy rain/snow events.

-Install a 12"x12" catch basin on the north
drain with a 4" drain line under the sidewalk
to daylight into existing rock swale to
minimize water flow over sidewalk
-Install 24"x24" catch basin on the south
drain with a 6" drain line under the sidewalk
to daylight into existing rock swale to
minimze water flow over the sidewalk

8, 9, 10

Chunks missing from
damaged curbing (3
locations)

Patch missing chunks and paint to
match.

Current setup allows
Install concrete planters in the
vehicles to hit the building
configuration shown in Attachment
around the Emergency
C.
entrance.

Repair sunken sidewalk and reseal
Sunken sidewalk section. building edging. Sidewalk repair shall be able to withstand the
(approx 300 sf)
weight of a standard skid-steer.

Cell tower pole makes
sidewalk too narrow to
navigate/operate snow
removal equipment.
(approx 35-40 sf)

Widen sidewalk leading up to and
around the cell tower to allow space