NAVFAC ATLANTIC
WORK ORDER NO. 1808024
NAVFAC CONTRACT NO. N40085-24-D-0009
B592 Renovations RM16-1405
At the
Philadelphia Navy Yard
Philadelphia, Pennsylvania
oF
PREPARED BY:
WRA
801 S. Caroline St.
Baltimore, MD 21231
N40085-24-D-0009
Architectural: Timothy Hutcheson,AIA;WRA Mechanical:
Civil:
Electrical:
Tony Olsen, P.E.; WRA
Structural:
Patrick O'Brien, P.E; WRA Fire Protection:
Geotechnical
N/A
Submitted By:
Date:
APPROVED BY:
Specifications:
James E. Donahue, R.A.
For Commander, NAVFAC:
Date: 23 October 2026
Kyle Daihl (SCI)
Brian Lewis (SCI)
Jeffrey Nichols(SCI)
NFPC RM 16-1405 BLDG 592
81560008
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 31 23.13 20
11/22, CHG 4: 02/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 02/24
01 32 17.00 20
11/23, CHG 1: 08/24
01 33 00
01 35 26
01 42 00
01 45 00
01 45 35
01 50 00
08/18, CHG 4: 02/21
08/23, CHG 1: 05/24
11/20, CHG 3: 08/24
01 57 19
01 74 19
08/22, CHG 2: 08/25
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
01 78 30.00 22
05/19, CHG 1: 08/21
05/23, CHG 1: 11/23
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA WORKBOOK (FDW)
GIS DATA DELIVERABLES
DIVISION 02 - EXISTING CONDITIONS
02 41 00
02 82 00
02 83 00
02 84 16
11/18, CHG 1: 11/19
DEMOLITION
ASBESTOS REMEDIATION
LEAD REMEDIATION
HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00
02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 20
05 05 23.16
05 12 00
05 40 00
05 50 13
05 51 00
05 51 33
05 52 00
05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
STRUCTURAL WELDING
08/18, CHG 2: 05/21 STRUCTURAL STEEL
05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
METAL STAIRS
METAL LADDERS
METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00
08/16, CHG 2: 11/18 ROUGH CARPENTRY
DOCUMENT PROJECT
NFPC RM 16-1405 BLDG 592
06 41 16.00 10
06 61 16
The beginning of the document. Download the full file to read on.