Attachment B - SPC 01of01

Updated

A PDF document (13.3 MB) attached to RM16-1405 Building 592 Renovations, from the Department of the Navy. Due Dec 1, 2026, 2:00 PM (UTC-5).

File name: Attachment B - 1808017_SPC_01of01.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NAVFAC ATLANTIC

WORK ORDER NO. 1808024

NAVFAC CONTRACT NO. N40085-24-D-0009

B592 Renovations RM16-1405
At the

Philadelphia Navy Yard
Philadelphia, Pennsylvania
oF

PREPARED BY:

WRA
801 S. Caroline St.
Baltimore, MD 21231
N40085-24-D-0009

Architectural: Timothy Hutcheson,AIA;WRA Mechanical:
Civil:
Electrical:
Tony Olsen, P.E.; WRA
Structural:
Patrick O'Brien, P.E; WRA Fire Protection:
Geotechnical

N/A

Submitted By:

Date:

APPROVED BY:

Specifications:
James E. Donahue, R.A.

For Commander, NAVFAC:
Date: 23 October 2026

Kyle Daihl (SCI)
Brian Lewis (SCI)
Jeffrey Nichols(SCI)

NFPC RM 16-1405 BLDG 592

81560008

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15

LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 14 00

01 20 00

01 30 00

01 31 23.13 20

11/22, CHG 4: 02/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 02/24

01 32 17.00 20

11/23, CHG 1: 08/24

01 33 00

01 35 26

01 42 00

01 45 00

01 45 35

01 50 00

08/18, CHG 4: 02/21
08/23, CHG 1: 05/24
11/20, CHG 3: 08/24

01 57 19

01 74 19

08/22, CHG 2: 08/25
02/19, CHG 3: 11/21

01 78 00

01 78 23

01 78 24.00 20

01 78 30.00 22

05/19, CHG 1: 08/21
05/23, CHG 1: 11/23

SUMMARY OF WORK

WORK RESTRICTIONS

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

SUBMITTAL PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY DATA WORKBOOK (FDW)

GIS DATA DELIVERABLES

DIVISION 02 - EXISTING CONDITIONS

02 41 00

02 82 00

02 83 00

02 84 16

11/18, CHG 1: 11/19

DEMOLITION

ASBESTOS REMEDIATION

LEAD REMEDIATION

HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

DIVISION 03 - CONCRETE

03 30 00

02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 20

05 05 23.16

05 12 00

05 40 00

05 50 13

05 51 00

05 51 33

05 52 00

05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

STRUCTURAL WELDING

08/18, CHG 2: 05/21 STRUCTURAL STEEL

05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

METAL STAIRS

METAL LADDERS

METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00

08/16, CHG 2: 11/18 ROUGH CARPENTRY

DOCUMENT PROJECT

NFPC RM 16-1405 BLDG 592

06 41 16.00 10

06 61 16

The beginning of the document. Download the full file to read on.