6"
FLOW SWITCH
FEET
GAUGE
GENERAL CONTRACTOR
GALLONS PER MINUTE
GENERATOR RUNNING
GENERATOR FAULT
HEIGHT
HI/LOW AIR SUPERVISORY
HEAT TRACING
INSIDE DIAMETER
KITCHEN HOOD SUPPRESSION SYSTEM
LIGHT HAZARD
LOCAL OPERATING CONSOLE
MASS NOTIFICATION SYSTEM
OUTSIDE DIAMETER
ORDINARY HAZARD
PRIMARY ELEVATOR RECALL
PRESSURE SWITCH
POUNDS PER SQUARE INCH
RISER/RADIUS/RETURN
RISER CONTROL VALVE
REQUIRED
ROOM
RISER NIPPLE
REDUCED PRESSURE ZONE
SUPPLY
SUPERVISED BUTTERFLY VALVE
SCHEDULE
SUPERVISED CONTROL VALVE
SMOKE DETECTOR
SMOKE DAMPER CONTROL
SUPERVISED GATE VALVE
SIMILAR
SOUND SYSTEM OVERRIDE
SPEAKER
SPECIFICATION
SPRINKLER
SPEAKER/ STROBE
SQUARE
SLEEPING ROOM
SECURITY SYSTEM INTERFACE
STROBE
STANDPIPE
STORAGE
SHUNT TRIP SUPERVISION
SYSTEM
SPRINKLER SYSTEM FEED MAIN
TEMPERATURE
TOP OF RISER
TAMPER SWITCH
TYPICAL
UNDERWRITERS' LABORATORY
UNLESS NOTED OTHERWISE
VOLT, ALTERNATING CURRENT
WITH
WATER MOTOR GONG
WITHOUT
WEATHERPROOF
WET SYSTEM
ZONE CONTROL ASSEMBLY
FIRE SUPPRESSION GENERAL NOTES
1.
THE FIRE PROTECTION SCOPE OF WORK INVOLVES MODIFICATIONS TO THE EXISTING FIRE SUPPRESSION SYSTEM SERVING THE AREAS IN THE PROJECT SCOPE OF WORK BOUNDARY AS INDICATED ON THE DRAWINGS AND PROVIDING A NEW WET PIPE SPRINKLER SYSTEM TO SERVE THE GENERATOR BUILDING.
2.
ALL AREAS ARE TO BE PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS UNLESS OTHERWISE NOTED.
3.
SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:
A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)
B. IBC - INTERNATIONAL BUILDING CODE, 2021
C. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION
D. NFPA 70 - NATIONAL ELECTRIC CODE, 2020 EDITION
E. NFPA 101 - LIFE SAFETY CODE, 2021 EDITION
F. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION
4.
PROVIDE A COMPLETE, AUTOMATIC WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 REQUIREMENTS AND VA STANDARDS IN ALL AREAS AS NOTED ON PLANS.
5.
BUILDING 143 HAS AN EXISTING TO REMAIN 750 GPM @ 85 PSI RATED FIRE PUMP LOCATED IN THE SUB-BASEMENT.
6.
IN GENERAL, SPRINKLERS SHALL BE ARRANGED FOR A MAXIMUM COVERAGE OF UNDER 225 SQUARE FEET PER HEAD FOR LIGHT HAZARD OCCUPANCIES AND 130 SQUARE FEET PER HEAD FOR ORDINARY HAZARD OCCUPANCIES AND 100 SF FOR EXTRA HAZARD OCCUPANCIES. COORDINATE WITH OTHER DISCIPLINES TO AVOID OBSTRUCTIONS SUCH AS LIGHTS, DIFFUSERS, ETC.
7.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PIPING AND SPRINKLER HEADS FOR PROPER COVERAGE IN EACH AREA AND ADD ADDITIONAL HEADS TO OBTAIN PROPER COVERAGE AS REQUIRED BY VARIATIONS IN FIELD
The beginning of the document. Download the full file to read on.
Other documents in this bid
- ATTACHMENT A1 - 658-19-103 Specifications Volume 1
- ATTACHMENT A2 - 658-19-103 Specifications Volume 2
- ATTACHMENT A3 - 658-19-103 Specifications Volume 3
- ATTACHMENT D - Salem VA Medical Center Facility Map
- ATTACHMENT E - Broad Agency Announcement TAA COMPLIANCE CERTIFICATION
- Solicitation Form (SF 1442) Invitation for Bids SOLICITATION