Attachment C - Drawings
Updated
A PDF document (17.2 MB) attached to Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction, from the Department of Veterans Affairs. Due Nov 6, 2026, 2:00 PM (UTC-5).
File name: Attachment C - Drawings.pdf
The full file is for paid members, or buy this bid alone.
Preview
LJ
DRAWING NOTES:
1.
ALL SHOWN AS EXISTING UNLESS OTHERWISE INDICATED.
2.
REFER TO INSTALLATION ONE-LINE DIAGRAMS ON DRAWINGS EP-1>01 AND EP-1>02.
3.
CORRIDOR AREA IS SUSPENDED CEILING AND AREA ABOVE SUSPENDED CEILING IS
VERY CONGESTED. COORDINATE EXACT ROUTING IN FIELD PRIOR TO
CONSTRUCTION.
4.
PROVIDE ALL REQUIRED TEMPORARY LIGHTING FOR AREAS SERVED BY LIFE
SAFETY LIGHTING CIRCUITS DURING BRANCH CIRCUIT CHANGEOVERS TO LIFE
SAFETY SYSTEM.
B.EVATOR LOOBY
ft>
m
□
C
•"
•e
□
.5
ro,
1 BED RM
152.95
1 BED RM
153.52
1 BED RM
152.95
1 BED RM
153'2
1 BED RM
152.95
1 BED RM
1 BED RM
153.52
1 BED RM
152.95
15&�
""
�.,
TOILET
�"'
1 BED RM
152.95
lREATMENT
416.99
•
�
□
CORRIDOR SE 1A
'84.26
�
�
••
C
TOILET
25.00
TOILET
19.74
C
�,,
E.C.
"'
"'
5�
WARD SEC.
143.05
t-lJRSE'S STAT
138.79
�7
"�
LINEN
M1
OFFICE
20a�
EXAMR(){J.1
230.�
"'
SHOWER
17.70
"'
"'
LOCKER RM
138.00
1 BEDRf.l
148.02
OFFICE
133.98
�1
OFFICE
152Dll
SHOWER
17.70
"'�
OFFICE
151.59
OFFICE
147.76
OFAC
151.5!
I�
OOCT
TIJBE ROOM
65.25
STAIR#:!
141.41
PWMB
SHAF7
□
"'
"9A
2.
PROVIDE TRANSFORMER AS INDICATED AND SCHEDULED.
3.
PROVIDE POWER CIRCUIT, REFER TO INSTALLATION ONE-LINE DIAGRAMS.
4.
DISCONNECT AND PULL BACK LIFE SAFETY BRANCH CIRCUITS FROM PANEL
INDICATED. BRANCH CIRCUITS SHALL BE REFED FROM LIFE SAFETY PANEL.
PROVIDE BRANCH CIRCUITS TO INTERCEPT AND REFEED LIFE SAFETY BRANCH
CIRCUITS. REFER TO PANEL SCHEDULES ON DRAWING EP-1>04 FOR ADDITIONAL
REQUIREMENTS. LIFE SAFETY PANELS SHALL BE INSTALLED AND TESTED PRIOR TO
TRANSFERRING OF EXISTING LIFE SAFETY BRANCH CIRCUITS. THIS WORK SHALL
TAKE PLACE ON EVENING/NIGHT SHIFTS.
5.
PROVIDE ALL MATERIAL AND LABOR TO REMOVE SUSPENDED CEILING TILES TO
FACILITATE ELECTRICAL WORK IN THE AREA. PROVIDE REPLACEMENT SUSPENDED
CEILING TILES FOR ANY DAMAGED TILES DURING CONSTRUCTION. REPLACEMENT
SUSPENDED CEILING TILES SHALL MATCH EXISTING STYLE AND COLOR. THIS WORK
SHALL TAKE PLACE ON EVENING/NIGHT SHIFTS.
6.
PROVIDE ALL REQUIRED FLOOR PENETRATIONS THROUGH CONCRETE FLOOR FOR
POWER CIRCUITS TRANSITIONING TO/FROM FLOOR BELOW. SEAL PENETRATIONS
FOR A 2-HOUR FIRE RATING. THIS WORK SHALL TAKE PLACE ON EVENING/NIGHT
SHIFTS.
LOCKER/STOR
TOILET
24.2'1
CLOSE
.1
..,
""
OOCT
"'°
65,0
7.
PROVIDE 4-BRANCH CIRCUITS (1-#12, 1-#12N, 1-#12G IN3/4"C) TO ELEVATOR P-1> AND
S-5 LIGHTING DISCONNECT SWITCH AND CONTROL PANEL IN ELEVATOR MACHINE
ROOM. DISCONNECT AND REMOVE EXISTING LIGHTING AND CONTROL CIRCUITS
COMPLETE FROM PANEL PPSH.
TOILfl
24.58
�·
NC EQUIP
9127
123.TT
□
�·
The beginning of the document. Download the full file to read on.