DRAWING NOTES:

1.

ALL SHOWN AS EXISTING UNLESS OTHERWISE INDICATED.

2.

REFER TO INSTALLATION ONE-LINE DIAGRAMS ON DRAWINGS EP-1>01 AND EP-1>02.

3.

CORRIDOR AREA IS SUSPENDED CEILING AND AREA ABOVE SUSPENDED CEILING IS

VERY CONGESTED. COORDINATE EXACT ROUTING IN FIELD PRIOR TO

CONSTRUCTION.

4.

PROVIDE ALL REQUIRED TEMPORARY LIGHTING FOR AREAS SERVED BY LIFE

SAFETY LIGHTING CIRCUITS DURING BRANCH CIRCUIT CHANGEOVERS TO LIFE

SAFETY SYSTEM.

B.EVATOR LOOBY

ft>
m

□

C

•"

•e

□

.5

ro,

1 BED RM

152.95

1 BED RM

153.52

1 BED RM

152.95

1 BED RM

153'2

1 BED RM

152.95

1 BED RM

1 BED RM

153.52

1 BED RM

152.95

15&�

""

�.,

TOILET

�"'

1 BED RM

152.95

lREATMENT

416.99

•

�

□

CORRIDOR SE 1A

'84.26

�
�

••
C

TOILET

25.00

TOILET

19.74

C

�,,
E.C.

"'

"'

5�
WARD SEC.
143.05

t-lJRSE'S STAT

138.79

�7

"�

LINEN

M1

OFFICE

20a�

EXAMR(){J.1

230.�

"'

SHOWER

17.70

"'

"'

LOCKER RM

138.00

1 BEDRf.l

148.02

OFFICE

133.98

�1

OFFICE

152Dll

SHOWER

17.70

"'�

OFFICE

151.59

OFFICE

147.76

OFAC

151.5!

I�

OOCT

TIJBE ROOM

65.25

STAIR#:!

141.41

PWMB

SHAF7

□

"'

"9A

2.

PROVIDE TRANSFORMER AS INDICATED AND SCHEDULED.

3.

PROVIDE POWER CIRCUIT, REFER TO INSTALLATION ONE-LINE DIAGRAMS.

4.

DISCONNECT AND PULL BACK LIFE SAFETY BRANCH CIRCUITS FROM PANEL

INDICATED. BRANCH CIRCUITS SHALL BE REFED FROM LIFE SAFETY PANEL.

PROVIDE BRANCH CIRCUITS TO INTERCEPT AND REFEED LIFE SAFETY BRANCH

CIRCUITS. REFER TO PANEL SCHEDULES ON DRAWING EP-1>04 FOR ADDITIONAL

REQUIREMENTS. LIFE SAFETY PANELS SHALL BE INSTALLED AND TESTED PRIOR TO

TRANSFERRING OF EXISTING LIFE SAFETY BRANCH CIRCUITS. THIS WORK SHALL

TAKE PLACE ON EVENING/NIGHT SHIFTS.

5.

PROVIDE ALL MATERIAL AND LABOR TO REMOVE SUSPENDED CEILING TILES TO

FACILITATE ELECTRICAL WORK IN THE AREA. PROVIDE REPLACEMENT SUSPENDED

CEILING TILES FOR ANY DAMAGED TILES DURING CONSTRUCTION. REPLACEMENT

SUSPENDED CEILING TILES SHALL MATCH EXISTING STYLE AND COLOR. THIS WORK

SHALL TAKE PLACE ON EVENING/NIGHT SHIFTS.

6.

PROVIDE ALL REQUIRED FLOOR PENETRATIONS THROUGH CONCRETE FLOOR FOR

POWER CIRCUITS TRANSITIONING TO/FROM FLOOR BELOW. SEAL PENETRATIONS

FOR A 2-HOUR FIRE RATING. THIS WORK SHALL TAKE PLACE ON EVENING/NIGHT

SHIFTS.

LOCKER/STOR

TOILET

24.2'1

CLOSE

.1

..,

""

OOCT

"'°

65,0

7.

PROVIDE 4-BRANCH CIRCUITS (1-#12, 1-#12N, 1-#12G IN3/4"C) TO ELEVATOR P-1> AND

S-5 LIGHTING DISCONNECT SWITCH AND CONTROL PANEL IN ELEVATOR MACHINE

ROOM. DISCONNECT AND REMOVE EXISTING LIGHTING AND CONTROL CIRCUITS

COMPLETE FROM PANEL PPSH.

TOILfl
24.58

�·

NC EQUIP

9127

123.TT

□

�·