CONSTRUCTION STATEMENT OF WORK FOR
Project Name:
Replace Fire Suppression Systems BLDG 61
Project Number:
663A4-24-209
Place of Performance: American Lake Campus
9600 Veterans Drive Southwest
Lakewood, WA 98439
AF
T
Part 1: Project Scope of Work Overview:
Contractor shall provide all labor, materials, and equipment to replace the fire suppression systems at Building 61 in accordance with the associated and published/provided contract 100% Construction Documents (Drawings, Specifications, etc.). The Government requires the newly replaced systems to operate seamlessly with the existing systems at the American Lake campus. The replacement of the existing systems is to be performed within tolerance delineated in the Manufacturer's Installation Instructions. The new replacement packages will be submitted in accordance with the contract submittal process and approved by the Government prior to the Contractor proceeding with any part of the scope of work.
D
R
The materials to be installed shall be new and installed per Manufacturer’s Installation instructions. The Contractor shall provide product data on the materials to be installed in this project with its proposal. With execution of the Contract, and once the submittals are approved, the Contractor is authorized to order materials immediately thereafter. Construction debris and hazardous materials must be removed and disposed of in accordance with the Department of Veteran Affairs Infection Control Procedures, Federal and State Environmental Protection Procedures, and the published construction waste management policy for contractor work on a VA Campus.
The period of performance for this scope of work is three-hundred and sixty-five calendar days from the notice to proceed. All work is to be performed during normal operational business hours; work performed outside daily operating hours must be approved by the COR 14-days prior to the intended scheduled off-hour work commencing.
Part 2: Period of Performance (POP) and Project Construction Cost Magnitude: Complete all work including submittals, reviews, and quality control within 365 calendar days from Notice to Proceed (NTP) as shown below including final cleaning, inspections, corrections, and demobilization from the project site. This will be a phased project as described in the Drawings provided by the AE.
PERIOD OF PERFROMANCE CHART (IN CALENDAR DAYS AFTER AWARD)