ATTACHMENT D | EQUIPMENT AND TEST MATRIX

Electrical Distribution System Inspection, Testing, Maintenance, Calibration, and Infrared Scanning. Atlanta VA Health Care System (Station 508). Revision 19, August 25, 2026. This matrix defines the required level of work by equipment class and applies to the equipment listed in Attachments A, B, and C. Where a class is not present at a site, its row does not apply. Test methods follow ANSI/NETA MTS in the edition adopted by the VA and the authority having jurisdiction as of the solicitation date, and the manufacturers' instructions. This attachment governs test method only to the extent it is consistent with the Statement of Work; it does not add an asset, add a quantity, or expand the base scope (Statement of Work, Section 3.1). Equipment class
Visual and mechanical
Energized infrared (IR)
De-energized electrical tests (require outage)
Unit substations, switchgear, main switchboards, main distribution panels Inspect, clean, check hardware and connections; verify labeling and grounding Yes, under load
Insulation resistance; contact resistance on main and tie devices; connection-torque verification Distribution panelboards
Inspect, check connections and hardware
Yes, under load
Insulation resistance and connection-torque verification on de-energized panels Motor control centers, where listed in Attachments A, B, or C Inspect buckets, connections, and hardware
Yes, under load
Insulation resistance; connection-torque verification
Dry-type transformers
Inspect core, connections, ventilation, and grounding
Yes, under load
Insulation resistance; turns ratio
Medium-voltage main distribution transformer (liquid-filled, Trinka-Davis) Inspect bushings, tank, connections, liquid level, and grounding Yes, under load
Insulation resistance; turns ratio at all taps; winding resistance; power/dissipation factor; insulating-liquid dielectric breakdown and dissolved gas analysis Automatic transfer switches
Inspect, exercise mechanism, check main and neutral connections Yes, under load
Controller and functional verification; timing; a load transfer only when approved through the outage plan and coordinated with the COR Generator output and main breakers
Inspect, check connections
Yes
Connection check; trip verification. Generator sets are excluded (separate program) Safety-switch and service disconnects
Inspect, operate, check connections
Yes, under load
Contact and connection check; mechanical operation

The beginning of the document. Download the full file to read on.