Home / USCG IPD Cape May Crane Repairs / Document

Attachment I Scope of Work Mobile Crane Repair

Updated

A PDF document (155 KB) attached to USCG IPD Cape May Crane Repairs, from the US Coast Guard. Due Nov 25, 2026, 5:00 PM (UTC-5).

File name: Attachment I Scope of Work Mobile Crane Repair.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment, as required to replace approximately 22 one inch bolts at the base of the turntable boom foundation on a BMC Broderson 18 Ton Mobile Crane. Model: IC-250-3E. Serial Number 69849250 located at USCG Industrial Production Detachment, 1 Munro Ave, Cape May, NJ 08204.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon

acceptance the contractor shall perform repairs between the hours of 0700 and 1430 Monday – Friday.. 3. SCOPE OF WORK: The contractor shall replace current discrepancies listed within the General Requirements. Machinery History: One of the 22 bolts had broken on the turntable located at the base of the main boom. Manufacturer recommends replacing the one broken bolt in addition to the remaining turntable bolts, torque bolts to specification and load test once completed.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all conditions before submitting bids. Interested parties shall make arrangements for a site visit with Mr. Troy VanCleave @ (609) 898-6984. Recommend site visit period between 16 November and 20 November 2026.

5. DESIGNATED CONTRACTING OFFICER'S QUALITY ASSURANCE

EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer's QAE representative and Point of Contact for this project is Troy VanCleave. Inquiries concerning any phase of the specification before or after award shall be made to Troy VanCleave. 6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification, or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer's QAE representative of his intended start date. The work shall be done in accordance with the specification. The period of performance for this contract must not exceed 30 working days after contract award or as negotiated with Contracting Officer and

The beginning of the document. Download the full file to read on.

Other documents in this bid