Attachment J-1 Solicitation Mandatory Response Questions
Updated
A PDF document (87 KB) attached to Parking at 800 N Capitol St NW Washington DC 20002, from the Court Services and Offender Supervision Agency. Due Oct 29, 2026, 11:00 AM (UTC-4).
File name: 2_2_1_Attachment_J-1_Solicitation_Mandatory_Response_Questions.pdf
The full file is for paid members, or buy this bid alone.
Preview
9594CS27Q0001
Attachment J-1: Solicitation Mandatory Response Questions Yes/No
Description of Requirements
Does the garage provide accommodations for 15 monthly, unreserved parking spaces, within .25 miles (walking) or less from a parking garage to CSOSA downtown work site 800 North Capitol St. NW Washington, DC 20002? Does the garage provide a fully-enclosed and each parking level shall have access to an elevator lobby to exit via the garage’s associated building lobby onto a street? Are their handicap/wheel chair designated spaces which are open to all vehicle/parkers with a bona-fide accessible sticker/hang-tag or license plate on/in their vehicle?
If the parker/driver needs assistance, does the parker have an option to obtain assistance from the garage station attendants by calling them? Is there a handicap/ramped access from a parking level into an elevator access to exit the garage at street level via the garage’s associated building lobby and returning to vehicle via same access?
Does the garage have the option for the driver/parker to allow the garage station attendant to park the car for them if they choose?
Does the garage have a phone number visible near the attendant station inside of the garage, if a parker has an issue with their parking space after the garage is closed? Does the garage have the capability of providing annual parking passes? Does the parking garage have twenty-four hours a day, seven days a week (24/7) access for agency employees to park their vehicles?
Does the contractor provide and describe method(s) of accessing to the parking garage during and after normal operations hours?
Does the contractor provide a proof or certificate that the contractor has full operations control of the parking garage throughout the life of the contract? The garage must be capable of providing 24 hour access to parkers.
Quoter’s name and title
Quoter’s signature
Date
The beginning of the document. Download the full file to read on.