SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1
SAFETY REQUIREMENTS
A. Refer
to section 01 35 26, SAFETY REQUIREMENTS for safety
and infection control requirements.
1.2
GENERAL INTENTION
A. Contractor
shall completely prepare site for building
operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Install Parking Shades & Reconfigure Lots as
required by drawings, scope of work, and specifications.
B. Visits
to the site by Bidders may be made only by
appointment with the Medical Center Engineering.
C. All
employees of general contractor and subcontractors
shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3
STATEMENT OF BID ITEM(S)
A. ITEM
I, Install Parking Shades & Reconfigure Lots: Work
includes general construction, alterations, roads, walks, grading, drainage, and necessary removal of existing
structures and construction and certain other items to
support the install of the parking shades and reconfigure of the lots.
1.4 SPECIFICATIONS
A. Drawings
AND DRAWINGS FOR CONTRACTOR
and contract documents may be obtained from the
website where the solicitation is posted. Additional copies will be at Contractor's expense.
Department of Veteran Affairs
VA Southern Nevada Healthcare System
Project No.:593-26-306
Install Parking Shades & Parking Lot Reconfiguration
1.5
CONSTRUCTION SECURITY REQUIREMENTS
A. Security
1. The
Plan:
security plan defines both physical and
administrative security procedures that will remain
effective for the entire duration of the project.
2. The
General Contractor is responsible for assuring that
all sub-contractors working on the project and their
employees also comply with these regulations.
B. Security
Procedures:
1. General
Contractor’s employees shall not enter the
project site without appropriate badge.
They may also be
subject to inspection of their personal effects when
entering or leaving the project site.
2. Before
starting work the General Contractor shall give
one week’s notice to the Contracting Officer so that
security arrangements can be provided for the employees. This notice is separate from any notices required for
utility shutdown described later in this section.
3. No
photography of VA premises is allowed without written
The beginning of the document. Download the full file to read on.
Other documents in this bid
- ATTACHMENT B - PHASE 1 FACTOR 3 - Past Performance Questionnaire
- Attachment Assignment 44 - BOD Conceptual Design for Carports
- Attachment Assignment 44 - Parking Study
- Attachment REQUEST FOR INFORMATION FORM
- Attachment VAAR 852.219- DEVIATION
- DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS
- Request for Proposals 2
- Attachment Statement of Work
- Commercial Construction Clause 52.212-4
- Instruction to Offerors DESIGN BUILD
- Attachment ED Parking Expansion
- Phase One Request for Information Q-A Response