Preview

Department of Veteran Affairs
VA Southern Nevada Healthcare System
Project No.:593-26-306
Install Parking Shades & Parking Lot Reconfiguration

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1

SAFETY REQUIREMENTS

A. Refer

to section 01 35 26, SAFETY REQUIREMENTS for safety

and infection control requirements.

1.2

GENERAL INTENTION

A. Contractor

shall completely prepare site for building

operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Install Parking Shades & Reconfigure Lots as

required by drawings, scope of work, and specifications.

B. Visits

to the site by Bidders may be made only by

appointment with the Medical Center Engineering.

C. All

employees of general contractor and subcontractors

shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3

STATEMENT OF BID ITEM(S)

A. ITEM

I, Install Parking Shades & Reconfigure Lots: Work

includes general construction, alterations, roads, walks, grading, drainage, and necessary removal of existing

structures and construction and certain other items to

support the install of the parking shades and reconfigure of the lots.

1.4 SPECIFICATIONS

A. Drawings

AND DRAWINGS FOR CONTRACTOR

and contract documents may be obtained from the

website where the solicitation is posted. Additional copies will be at Contractor's expense.

Department of Veteran Affairs
VA Southern Nevada Healthcare System
Project No.:593-26-306
Install Parking Shades & Parking Lot Reconfiguration

1.5

CONSTRUCTION SECURITY REQUIREMENTS

A. Security

1. The

Plan:

security plan defines both physical and

administrative security procedures that will remain
effective for the entire duration of the project.

2. The

General Contractor is responsible for assuring that

all sub-contractors working on the project and their
employees also comply with these regulations.

B. Security

Procedures:

1. General

Contractor’s employees shall not enter the

project site without appropriate badge.

They may also be

subject to inspection of their personal effects when
entering or leaving the project site.

2. Before

starting work the General Contractor shall give

one week’s notice to the Contracting Officer so that

security arrangements can be provided for the employees. This notice is separate from any notices required for
utility shutdown described later in this section.

3. No

photography of VA premises is allowed without written

The beginning of the document. Download the full file to read on.