B.07 Pre-Proposal Conference Pass-A-Grille-Pass
Updated
A PDF document (894 KB) attached to Pass-A-Grille-Pass, Maintenance Dredging, Pinellas County, Florida, from the Department of the Army. Due Nov 20, 2026, 2:00 PM (UTC-5).
File name: B.07 Pre-Proposal Conference_GROUP1-27-R-J001_Pass-A-Grille-Pass.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION NO. GROUP1-27-R-J001
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING,
PINELLAS COUNTY, FLORIDA.
Pre-Proposal Conference
Presented by:
Jacksonville District
November 04, 2026
Working Today to
Build a Better Tomorrow
Thank you for joining,
we will begin shortly.
Please mute your
microphone.
PRE-PROPOSAL CONFERENCE: AGENDA
•
INTRODUCTION
•
PROJECT OVERVIEW
•
TECHNICAL OVERVIEW
•
ENVIRONMENTAL REQUIREMENTS
•
CONTRACTING OVERVIEW
•
OTHER ADMINISTRATIVE ITEMS
•
RESOURCES
•
CLOSING REMARKS
PROJECT OVERVIEW
PRE-PROPOSAL CONFERENCE: PROJECT OVERVIEW
SOLICITATION NUMBER: GROUP1-27-R-J001
PROJECT TITLE: Pass-A-Grille-Pass, Maintenance Dredging, Pinellas County, Florida. DESCRIPTION OF WORK: Project work consists of maintenance dredging within Pass-a-Grille Pass as denoted in the drawings. Transport and place excavated material onto the Pass-a-Grille Beach Placement Area, located immediately north of the channel. Incidental work for the project includes but is not limited to MEC construction support, environmental monitoring, water quality monitoring, beach fill quality control, screening, vibration control and monitoring, and beach tilling. PROJECT LOCATION: The project is located at Pass-A-Grille Pass, Pinellas County, Florida.
TECHNICAL OVERVIEW
PRE-PROPOSAL CONFERENCE: TECHNICAL OVERVIEW
Pipeline may be placed over or around the
terminal groin.
Dredging: Cut-1 STA. 1+00 to Cut-2 STA. 12+00
10-Foot Required Depth + 1-Foot Allowable Overdepth
ENVIRONMENTAL REQUIREMENTS
PRE-PROPOSAL CONFERENCE: ENVIRONMENTAL REQS
•
Manatee Monitoring
•
•
•
Dedicated manatee observer during day and night operations, for all vessels; required in the IMA only Observer required during day and night operations, for clamshell/mechanical dredges, anywhere in the project area
Beach Monitoring
• Turtles
If dredging and placement has commenced on or before April 15th – turtle monitoring and nest relocation begins April 15th and goes through September 19th or when work is completed, whichever is earlier •
If dredging and placement has NOT commenced on or before April 15th – turtle monitoring and nest relocation must begin for 65 days PRIOR to performing work or on April 15th, whichever is later, until September 19th or when work is completed, whichever is earlier •
Must use FWC-approved marine turtle permit holder
– Mr. Bruno Falkenstein with Sea Turtle Trackers
– 727-480-5382 or [email protected]
•
•
Birds
Monitoring of construction area begins February 15th or 10 days prior to construction activity beginning, whichever is later, through