DEPARTMENT OF HOMELAND SECURITYUNITED STATES COAST GUARD
BASE LOS ANGELES LONG BEACHSAN PEDRO, CALIFORNIA 90731
Scope of WorkDated: 11/10/2026
FOR
Base Smoke Detector Removal & Replacement for BLDG#25.
Base Los Angeles Long BeachSan Pedro, CA
Base Los Angeles Long Beach
Initial
Date
TBD
Contracting Officer (KO)
Eric Martincavage
Contracting Officers Representative (COR)
Brandon McKee, LT
BASE FACILITY ENGINEER
GENERAL REQUIREMENTS
PART 1 GENERAL
SCOPE OF WORK: Provide all labor, materials, and equipment necessary to perform Smoke Detector Removal & Replacement testing and inspections and diagnostic tests for accessible peripheral devices connected to the facility fire protection systems on Base LA/LB. The work includes, but is not limited to, the following: Replace all existing detectors with new smoke detectors & base mounts located in building 25, approximately 100. Leave (10) spare addressable heads and bases for replacements. Test for Proper operation of devices.
Program fire panel system.
LOCATION: Project site is located on US Coast Guard Base Los Angeles Long Beach, 1001 South Seaside Avenue, San Pedro, CA 90731. Bldg. 25. Contracting Officer is TBD. SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact Eric Martincavage, at (206) 815-4257 to arrange site access. Vendors must have DUNS and be registered at System for Award Management (SAM.gov) prior to be awarded a government Purchase Order. CONTRACTOR SECURITY REQUIREMENTS: For this affected Coast Guard facility, the Contractor shall provide a list of all on-site personnel, including sub-contractors and suppliers, to the Contracting Officers Representative (COR) 5 days prior to commencing work for clearance. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise, access to the Coast Guard facility may be denied.