Bid document
Updated
A PDF document (186 KB) attached to ID Flap Clear 4783(1), Dent Bridge Road Improvements, from the Federal Highway Administration.
File name: QA_09.14.26.pdf
The full file is for paid members, or buy this bid alone.
Preview
Project No.
Project
ID FLAP CLEAR 4783(1)
Dent Bridge Road Improvements
Check General or Technical
#
General
Technical
Question
Can a project-specific alternative material be
evaluated during design or presolicitation, or
only through a MATOC prime after the taskorder RFP is issued?
X
Answer
Date
A question or RFI can be submitted during
the solicitation/offer period however
proposed changes to the pavement or
geotechnical design would most likely be
evaluated under FAR Part 48, value
engineering change proposal (VECP), after
the task order is issued.
9/14/26
X
Who owns the technical approval and
specification review for the Section 305 FDR
material?
The WFLHD Construction Operations
Engineer and WFLHD Pavement Engineer
would evaluate VECP related to Section
305.
X
What testing and submittal information would
be expected—for example, testing of
representative project materials, compressive
strength, durability or moisture conditioning,
and any field-trial requirements?
The specific material requirements for the
project such as submittal requirements,
field testing, non-field testing, etc. will be
identified in the upcoming solicitation
documents.
9/14/26
9/14/26
The beginning of the document. Download the full file to read on.