Questions and Answers
TX FW LGA 10(5) Steve Thompson Wildlife Drive
IFB # 6982AF27B000006
October 8, 2026
Questions
Please provide clarification on the aggregate surface course.
Answers
See Sub-section 104.07
The geotech recommends hmac, the aggregate surface
recommendation seems to require a base material.
Will the base material specification govern?
Please confirm that the FDR process includes milling, moisture conditioning, reshaping/filling low spots, and recompacting? Is there a bonding agent required between compacted base material and new aggregate?
See Amendment 001 (A001). A bonding agent is not required.
October 13, 2026
Questions
What is the period of performance for this project?
Answers
See Section 108
Questions and Answers
TX FW LGA 10(5) Steve Thompson Wildlife Drive
IFB # 6982AF27B000006
October 16, 2026
Questions
Water Source for Construction
Reference: FP-24 Subsections 158.03 and 304.06; Bid Items A0080, A0090, A0100
Answers
See Section 105.No approved water source is available on the refuge or within the project limits. The contractor is fully responsible for locating, permitting, purchasing, and hauling all water required for the project
Is there an approved water source on the refuge or within the project limits that the Contractor may use for full depth reclamation moisture conditioning, aggregate placement, compaction, and dust control? If so, please identify its location and any associated fees, metering, or use restrictions. If no on-site source is available, please confirm that the Contractor is responsible for locating, permitting, purchasing, and hauling all water.
Payment for Soft and Unstable Areas
Reference: SCR 304.03 (page E-30); FP-24 Subsections 204.07 and 109.05
See Amendment 001 (A001).
SCR 304.03 requires the Contractor to repair soft and unstable areas according to Subsection 204.07 before starting full depth reclamation. The bid schedule does not include pay items for subexcavation, select borrow, or additional aggregate, and the Geotechnical Engineering Report (Section 5.2.1) indicates soft clay subgrade should be anticipated. How will the repair of soft and unstable areas be measured and paid? Will this work be ordered under the rental equipment and general labor items
Questions and Answers
TX FW LGA 10(5) Steve Thompson Wildlife Drive
IFB # 6982AF27B000006
(A0140 through A0170), handled by contract modification, or considered incidental to the full depth reclamation items? Electronic Alignment and Survey Data