A PDF document (179 KB) attached to ID Flap Kooten 8450(1), Yellowstone Trail Road, Segment 1, from the Federal Highway Administration. Due Nov 13, 2026, 2:00 PM (UTC-8).
File name: QA_10.29.26.pdf
The full file is for paid members, or buy this bid alone.
Preview
Project No.
Project
ID FLAP KOOTEN 8450(1)
Yellowstone Trail Road, Segment 1
Check General or Technical
General
Technical
Answer
Date
X
Do the station ranges in Table 269-1 already
include the 50-ft extension, or must the MRB
extend 50 ft beyond those stations?
The contractor's means and methods will
dictate the exact length of active scaling or
other upslope work areas. The MRB must
extend at least 50 ft beyond active scaling or
other upslope work areas.
10/29/26
X
May a single MRB be used at one station range
and then relocated to the other, or must both
ranges be protected at the same time?
Temporary roadway rockfall protection
needs to be in place during the work
activities in Table 269-1.
10/29/26
Is the 180-ft length on Sheet I.5 a minimum
required length, or illustrative only?
The contractor's means and methods will
dictate the exact length of active scaling or
other upslope work areas. The MRB must
extend at least 50 ft beyond active scaling or
other upslope work areas.
10/29/26