Bid document
Updated
A Word document (18 KB) attached to FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009), from the Department of Veterans Affairs. Due Dec 2, 2026, 9:00 PM (UTC-5).
File name: 36C24626B0041.docx
The full file is for paid members, or buy this bid alone.
Preview
SUBJECT*
FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE*
23667
SOLICITATION NUMBER*
36C24626B0041
RESPONSE DATE/TIME/ZONE
12-09-2026 2 PM EASTERN TIME, NEW YORK, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Z2DA
NAICS CODE*
236220
PLACE OF PERFORMANCE
Veterans Affiars Medical Center
508 Fulton Street
Durham
POSTAL CODE
NC
COUNTRY
27705
CONTACT INFORMATION
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs
Network Contracting Office 6
100 Emancipation Drive
Hampton VA 23667
POINT OF CONTACT*
Alice Custis
[email protected]
ADDITIONAL INFORMATION
AGENCY’S URL
https://www.va.gov
URL DESCRIPTION
Department of Veterans Affairs website
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
Senior Contract Specialist, Alice Custis
DESCRIPTION
Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160
STATEMENT OF WORK
Description of Work - Summary:
The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping.
General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications.
The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate.
Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations.
Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items. Estimated construction magnitude is between $10,000,000.00 and $20,000,000.00 NAICS CODE: 236220Size Standard: $45.0 Million
All non-responsive bids shall be rejected and ineligible for award.
The beginning of the document. Download the full file to read on.