A PDF document (1.9 MB) attached to Replace, Nonskid Deck Covering on FWD 04 Level Weather Deck etc, from the Department of the Navy. Due Nov 18, 2026, 10:00 AM (UTC+9).
File name: 38E9367103R_00_A01.pdf
The full file is for paid members, or buy this bid alone.
Preview
1301426833
lhlDIHULL NO.
LID-17
lhlalHULL NAMI
U88 RUSHMORE
JON:
ICN:
Rav:
Key Op:
38RIMl14N
A01
TITLE:
Hull ltnacturw on 04 Level Deck; rapalr
1.1
Title: Hull Structure on 04 Level Deck; repair
1. 2
Location of Work:
1.3
1.2.1
04 Level Weather Deck (04-13-0-WEA)
1.2,2
RAM Equipment Room (04-19-0-Q)
1.2.3
RAH Handling Equipment Store (04-19-1-A)
1.2.4
Troop WR & WC (03-19-0-L)
Identification:
1.3.1
Quantity (One EA), Ventilation Duct for Exhaust System (02-141) Located in 1.2,4 around Frames 19-20 on overhead, Port, 15 Inch by 10 Inch Rectangular Shape Including 4 Inch OD Round Shape Duct, Flanged Ends, Non-Watertight, Aluminum
1.3.2
A Total of (32 SF) of Electrical Grade Sheeting Including Underlayment to be Replaced with Adhesive, Heat Weld Seam and Seal Edge for Replacing Deck Covering Down to Bare Substrate, Located in 1.2.2
Specification: MIL-DTL-15562G, TY-I
Size: 1/8 Inch Thick, 3 Feet Hide
Color: Blue Color
1.3.3
A Total of (3 SF) of Port Bulkhead, Located in 1.2.1 and 1.2.2,
See ENCLOSURE (A)
1.3.3.1
1.3.4
2.
A Total of (3 FT) of Vertical Stiffener
Quantity (One EA), Stuffing Tube, Size e, Steel, Deck Type, for Flood Light, Located in 1.2,1 and 1.2.4, See ENCLOSURE (A)
Ul'&DHCSI:
~27 'I.WI. 3/31/2<P '/.'Mori
2.1
Standard Items (FY2-4-¼
2.2
510-6101616 Rev c, HVAC Diagram 01 LVL & ABV
2.3
510-6101647 Rev e, HVAC 03 Level Frame 21 FWD
2.4
512-6101620 Rev D, HVAC Standard Details and GEN. Instructions
2.5
501-5287967 Rev J, Ventilation Standard Details and General Notes
2.6
155-7445969, S/A 1116K LSD 47, Deck House Ram Equipment Room No.1
2.7
139-6102529 Rev D, Unit 445 04 Deck FRS 13-21 C/L
2.8
167-7445989, S/A LSD-1116K LSD 47, Structural Door HODS 04 Level
lhlalHULL NO.
LID-47
ShlalHULL NAIi!
USS RUSHMORE
JON:
ICN:
Rev:
38R8Ml1~03
Key Op:
A01
TITLE:
Hull Structure on 04 Level Deck; repair
2.9
803-6397268 Rev B, Door Watertight, Quick Acting Arrangement
2.10 635-6101904 Rev C, Insulation Details
2.11 635-6101901 Rev C, Insulation ARR Thermal and Acoustic 03 Level and Above
2.12 331-7446025, Lighting System MOD Incidental FWD RAM GML 2.13 MIL-STD-2003B(SH), Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.14 MIL-STD-1310H(NAVY), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse(EMP) Mitigation, and Safety
3.
Rl:QU:IUMl!ffl:
3.1 Remove each existing ventilation duct listed in 1.3.1 to facilitate the hull structure repair work, using 2.2 through 2.5 for guidance. Upon completion of the repair work, install them.