SUBJECT*

657-27-209JB Renovate Main Lobby, Bldgs 1 & 53

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

66048

SOLICITATION NUMBER*

36C25527R0007

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

11-16-2026 12:00 PM CENTRAL TIME, CHICAGO, USA

ARCHIVE

90 DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

N

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

C1DA

NAICS CODE*

541310

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway

Leavenworth KS 66048

POINT OF CONTACT*

Contracting Officer
Maria Hoover
[email protected]
913-946-1130

PLACE OF PERFORMANCE

ADDRESS

St. Louis Va Medical Center-Jefferson Barracks

#1 Jefferson Barracks Dr.

St. Louis Missouri

POSTAL CODE

63125-4199

COUNTRY

USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

[email protected]

EMAIL DESCRIPTION

office email

DESCRIPTION

Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text:
Construction Budget questions:
Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions:
The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review.