Home / 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC / Document

Bid document

Updated

A Word document (21 KB) attached to 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC, from the Department of Veterans Affairs. Due Nov 13, 2026, 2:00 PM (UTC-6).

File name: 36C25527R0012.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview



SUBJECT*

657-26-102JC FCA Replace Various Roofs on BLDG 1, JC

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

66048

SOLICITATION NUMBER*

36C25527R0012

RESPONSE DATE/TIME/ZONE

11-13-2026 14:00pm CENTRAL TIME, CHICAGO, USA

ARCHIVE

30 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

Z2DA

NAICS CODE*

236220

PLACE OF PERFORMANCE

John Cochran VAMC

915 North Grand

St. Louis, MO 63106

POSTAL CODE

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway

Leavenworth KS 66048

POINT OF CONTACT*

Abby Monroe

[email protected]

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

[email protected]

EMAIL DESCRIPTION

DESCRIPTION

DESCRIPTION

TITLE OF PROJECT: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC Solicitation 36C25527R0012
Scope of work:
The General Description: VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to to replace various roofs identified through FCA report. Project will replace existing roofing beyond its useful life at JC. Roofs: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36,and R37; totaling approximately 44,000 SF. The following roof areas are modified bitumen roofs that have exceeded their useful life and should be replaced soon: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36, and R37.All work shall be performed in accordance with solicitation/contract terms and conditions,specifications and drawings, and all applicable VA TIL and local and National codes. Contractorshall furnish all supervision, tools, labor, materials, equipment, transportation and testingnecessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work.T his project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, associated appurtenances and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work.

The beginning of the document. Download the full file to read on.