Bid document
Updated
A Word document (24 KB) attached to 657A4-26-125 Conduct Roof Deck Assessment Building 8 ME FY27 NRM, from the Department of Veterans Affairs. Due Nov 4, 2026, 2:00 PM (UTC-6).
File name: 36C25526R0183_2.docx
The full file is for paid members, or buy this bid alone.
Preview
SUBJECT*
657A4-26-125 Conduct Roof Deck Assessment Building 8 ME FY27 NRM
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE*
66048
SOLICITATION NUMBER*
36C25526R0183
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
11-04-2026 14:00 CENTRAL TIME, CHICAGO, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
C1AZ
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth KS 66048
POINT OF CONTACT*
PLACE OF PERFORMANCE
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
657A4-26-125 Conduct Roof Deck Assessment Building
The purpose of this modification is to provide clarifications. See below. Additionally, the response date for SF330 submission is extended to 11/4/2026 @ 2:00pm CT to [email protected] & [email protected] Clarification to Evaluation Factor 1. ii: The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline in a State, the District of Columbia, or an outlying area of the United States shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work. Factor 1. iii Each resume shall include a minimum of three (3) and a maximum of five (5) specific completed projects in the past ten (10) years that best illustrate the individual team members’ experience relevant to this contract scope. Completed projects have been changed from five (5) to ten (10) years
2. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE
Due to this project/assessment not requiring follow on construction, the government will also accept relevant assessment projects that have been completed but did not result in construction or where construction period services were not required. It is acceptable to submit other roof assessment projects.
The beginning of the document. Download the full file to read on.