Home / NCO 17 AE Short Selection Database FY24 - FY27 / Document

Bid document

Updated

A Word document (23 KB) attached to NCO 17 AE Short Selection Database FY24 - FY27, from the Department of Veterans Affairs. Due Sep 30, 2027, 12:00 AM (UTC-5).

File name: 36C25723R0049 0001.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SUBJECT*

NCO 17 AE Short Selection Database FY24 - FY27

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

76504

SOLICITATION NUMBER*

36C25723R0049

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

09-27-2023 10:00 CENTRAL TIME, CHICAGO, USA

ARCHIVE

30 DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

N

SET-ASIDE

SDVOSBC

PRODUCT SERVICE CODE*

C1DA

NAICS CODE*

541310

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office (NCO) 17

1901 Veterans Memorial Dr. Building #171
Temple TX 76504

POINT OF CONTACT*

Contract Specialist
Eileen Myers
[email protected]
(254) 987-0201

PLACE OF PERFORMANCE

ADDRESS

Multiple Locations

Multiple Texas

POSTAL CODE

COUNTRY

Unite States

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

RFI Question and Answers

08/31/2023

Q1.Are we allowed to have teaming partners?
A1.Teaming arrangement has to be identified as an SDVOSB and certified with VetCert.

Q2.With respect to SF 330 Section F Projects – can we have multiple projects per page vs the standard one-page per project format? A2.According to OMB Control Number: 9000-0157 Standard Form 330 (Rev 08/20/2016) Page 2 of Instructions, Section F: paragraph 1-Section F. Example Projects Which Best Illustrate Proposed Team's Qualifications for this Contract. Select projects where multiple team members worked together, if possible, that demonstrate the team's capability to perform work similar to that required for this contract. Complete one Section F for each project. Present ten projects, unless otherwise specified by the agency. Complete the following blocks for each project:

Q3.Does Part II count towards the total page count?
A3.Whatever is provided from cover letter, SF330, and SAM is to be part of the entire submission and therefore counts towards the limit of 20 pages. 09/05/2023

Q4.Is this information to be submitted on SF330 forms? The Selection Criteria would be addressed in Section H and any project in Section F but are we requested to submit E resumes and a G Matrix and Part II? A4.Yes, all information should be submitted on the provided Form SF330 as instructed per line number 3 of the Pre- Solicitation notice. For Part I, the AE Contractor shall complete sections A through E at a minimum. For Part I, the AE contractor may complete sections F and G, as deemed appropriate. For Part I, section H is not required unless additional space is required.

For Part II, the AE Contractor shall complete this part in its entirety.

The beginning of the document. Download the full file to read on.

Other documents in this bid