Home / MSG cook services / Document

Bid document

Updated

A PDF document (205 KB) attached to MSG cook services, from the Department of State. Due Nov 3, 2026, 4:00 PM (UTC-5).

File name: QA_19C02026Q0016.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

QUESTION AND ANSWERS

SOLICITATION - 19C02026Q0016

COOK SERVICES

1. Is electronic submission of the proposal package via email permitted for this solicitation, or is physical delivery to the Embassy strictly mandatory? Answer: The proposal submission will be electronic.
2. If email submission is allowed, could you please confirm the designated email address(es) to which the complete offer should be submitted, along with any file size limits or formatting restrictions?
Answer:
Proposals
must
be
[email protected].

submitted

electronically

to

Please note that the total size of your proposal submission must not exceed 20 MB.
3. Can you please advise if there is an incumbent contract for this requirement and if so, can you please provide the contract award ID? Answer: That information is not available.
4. Food and groceries: Is the cost of food, groceries, beverages and food inventory included in the contractor's firm-fixed monthly price, or does the Government purchase them separately (e.g., the Mess NCO)? PWS appears to say both: Section 1 says the Mess NCO purchases food, while PWS 2.b says the contractor provides food provisions and storage, a 30-day stock and an emergency food plan. If the contractor does purchase food, is there a monthly food budget or a per-meal cost target?
Answer: The contractor is only required to quote for the food preparation services. The Government will purchase and provide all food supplies and other necessary items required to perform the services specified in the solicitation. Therefore, the cost of food and groceries should not be included in the contractor’s financial proposal.
The contractor remains responsible for managing the storage of Government-provided food supplies, maintaining the required 30-day stock, and developing and implementing an emergency food plan, as specified in the PWS. These responsibilities must be carried out using the supplies provided by the Government.

SENSITIVE BUT UNCLASSIFIED

5. Service days: Is service required Monday through Friday only (PWS 1.2.2), or all 7 days including weekends and holidays (Section 3.0)? Is service required on both U.S. and Colombian holidays, and how are deductions applied if the Contracting Officer requires no service on a given day? Answer: The contractor must include the cost of any overtime payments in the original quotation. Accordingly, the quoted price shall remain fixed and may not be adjusted if overtime services are required. Please refer to the updated table of Colombian public holidays for 2027

The beginning of the document. Download the full file to read on.

Other documents in this bid